Date
|
Hours
|
Work Log Summary
|
Details
|
04-05-2020
|
6.00
|
Weight and Balance
|
Details
|
|
|
03-12-2020
|
2.00
|
New tailwheel fork
|
Details
|
|
|
12-01-2019
|
6.00
|
Rivet on top deck
|
Details
|
|
|
06-30-2019
|
8.60
|
Remove CS plug; start to fit spinner
|
Details
|
|
|
01-27-2019
|
6.00
|
Brake lines, gear leg fairings 1
|
Details
|
|
|
10-13-2018
|
2.00
|
Install rudder cable exit fairings
|
Details
|
|
|
08-12-2017
|
6.50
|
Fit panel center support
|
Details
|
|
|
01-28-2017
|
2.00
|
Static tubing clips
|
Details
|
|
|
01-02-2017
|
7.50
|
Install tailcone top skin 1
|
Details
|
|
|
07-12-2016
|
5.00
|
Flap arm install
|
Details
|
|
|
05-08-2016
|
6.70
|
|
|
|
|
05-07-2016
|
7.00
|
Servo, skin, roll bar
|
Details
|
|
|
05-01-2016
|
7.50
|
Avionics tray
|
Details
|
|
|
04-30-2016
|
6.00
|
Canopy fitup III
|
Details
|
|
|
04-10-2016
|
5.00
|
Canopy fitup II
|
Details
|
|
|
04-09-2016
|
6.00
|
Canopy fitup I
|
Details
|
|
|
04-02-2016
|
5.00
|
Install canopy latch connect
|
Details
|
|
|
02-21-2016
|
8.00
|
Fuel line cover bracket and new fuse cart
|
Details
|
|
|
02-13-2016
|
7.50
|
Roll trim installation
|
Details
|
|
|
02-07-2016
|
6.00
|
Andair fuel filter brackets
|
|
|
|
01-23-2016
|
8.50
|
Fuel pump mounting and plumbing
|
Details
|
|
|
01-17-2016
|
8.00
|
Fuel line install 2
|
Details
|
|
|
01-16-2016
|
7.50
|
Fuel line install 1
|
Details
|
|
|
01-10-2016
|
6.00
|
Cabin and fuel valve
|
Details
|
|
|
01-03-2016
|
4.50
|
Fit forward deck
|
Details
|
|
|
12-30-2015
|
5.00
|
Vent brackets
|
Details
|
|
|
12-28-2015
|
6.00
|
Panel fitup
|
Details
|
|
|
12-26-2015
|
5.00
|
Panel edging 2
|
Details
|
|
|
12-19-2015
|
5.00
|
Panel edging
|
Details
|
|
|
12-13-2015
|
7.50
|
Canopy frame mount brackets 2
|
Details
|
|
|
12-12-2015
|
7.00
|
Canopy frame mount brackets 2
|
|
|
|
12-06-2015
|
8.00
|
Canopy frame mount brackets
|
Details
|
|
|
12-06-2015
|
1.00
|
Canopy frame assembly
|
Details
|
|
|
11-25-2015
|
1.00
|
Canopy frame cleanup
|
Details
|
|
|
11-24-2015
|
8.00
|
Fabricate canopy frame
|
Details
|
|
|
10-31-2015
|
4.50
|
Elevator pushrod fabrication
|
Details
|
|
|
10-25-2015
|
7.00
|
Install tubing for brake lines
|
Details
|
|
|
10-24-2015
|
6.50
|
Right side tank vent.
|
Details
|
|
|
10-18-2015
|
7.00
|
Install control column
|
Details
|
|
|
09-20-2015
|
6.00
|
Wing aft spar install shim, seat pan cover
|
Details
|
|
|
09-13-2015
|
7.00
|
Make fwd cover parts, prime/paint, fit up panel
|
Details
|
|
|
09-12-2015
|
5.00
|
Top skin dimpling 2
|
Details
|
|
|
09-12-2015
|
7.50
|
First wing install!
|
Details
|
|
|
09-07-2015
|
7.00
|
Top skin dimpling 1
|
Details
|
|
|
09-05-2015
|
6.00
|
Seat pan drilling for hinges (redo)
|
Details
|
|
|
08-30-2015
|
6.00
|
Baggage floor install
|
Details
|
|
|
08-29-2015
|
7.00
|
Full baggage panel fitup
|
Details
|
|
|
08-23-2015
|
7.60
|
Baggage back panel completion, nutplate install
|
Details
|
|
|
08-22-2015
|
8.00
|
Fit and drill top skins, baggage side panels, bagg
|
Details
|
|
|
08-15-2015
|
7.50
|
Final assembly of flap housing and elevator bellcr
|
Details
|
|
|
07-19-2015
|
6.50
|
Assembly, fit of flap housing
|
Details
|
|
|
07-11-2015
|
6.00
|
Riveting F-705 and canopy deck
|
Details
|
|
|
07-05-2015
|
6.00
|
Seat fabrication and fuse bracket install
|
Details
|
|
|
07-04-2015
|
7.00
|
Priming and painting seast and crotch strap mounts
|
Details
|
|
|
07-01-2015
|
5.00
|
Flap linkage install and flap housing parts
|
Details
|
|
|
06-26-2015
|
7.50
|
Upper firewall gussets canopy deck
|
Details
|
|
|
06-13-2015
|
7.00
|
Drilling the aft deck
|
Details
|
|
|
06-07-2015
|
7.50
|
Rolling the canoe!
|
Details
|
|
|
06-06-2015
|
3.00
|
Rotisserie prep
|
Details
|
|
|
05-31-2015
|
4.00
|
Final fuse riveting, part 2
|
Details
|
|
|
05-17-2015
|
5.00
|
Riveting and seat priming
|
Details
|
|
|
05-09-2015
|
5.00
|
Getting ready for the rotisserie
|
Details
|
|
|
04-26-2015
|
6.00
|
Final fuse riveting, part 1
|
Details
|
|
|
04-25-2015
|
8.00
|
Finishing the seat fit-up
|
Details
|
|
|
04-19-2015
|
8.00
|
Building up the seats
|
Details
|
|
|
04-12-2015
|
6.50
|
Forward fuse riveting, where I can.
|
Details
|
|
|
04-11-2015
|
6.00
|
Loading and tapeing rivets
|
Details
|
|
|
03-29-2015
|
8.00
|
Fuse reassembly2
|
Details
|
|
|
03-28-2015
|
6.00
|
Fuse reassembly1
|
Details
|
|
|
03-21-2015
|
7.50
|
Fuse reassembly prep
|
Details
|
|
|
03-15-2015
|
6.50
|
Misc. cabin painting and prep
|
Details
|
|
|
03-14-2015
|
8.50
|
Painting the interior cabin surfaces
|
Details
|
|
|
03-07-2015
|
8.50
|
D&D fuse side skins, priming of fwd fuse parts
|
Details
|
|
|
03-01-2015
|
5.50
|
Dimpling, deburring, and prepping fuse skins
|
Details
|
|
|
02-28-2015
|
7.00
|
Fuse disassembly for dimpling, etc
|
Details
|
|
|
02-21-2015
|
3.00
|
Beginning final drilling prior to dipmling
|
Details
|
|
|
02-08-2015
|
3.50
|
Fitting up rudder and brake pedals
|
Details
|
|
|
02-01-2015
|
4.00
|
Riveting brake pedals
|
Details
|
|
|
01-31-2015
|
5.00
|
Forward tank mount stiffeners and brake pedals
|
Details
|
|
|
01-25-2015
|
6.50
|
Drilling firewall to fuse brackets
|
Details
|
|
|
01-24-2015
|
6.00
|
Forward fuse stiffeners and longerons
|
Details
|
|
|
01-11-2015
|
6.00
|
Initial mounting of the firewall
|
Details
|
|
|
01-04-2015
|
5.00
|
Making the conical bends
|
Details
|
|
|
01-02-2015
|
6.00
|
Initial mating of center section and tail cone
|
Details
|
|
|
01-01-2015
|
4.50
|
Drilling crotch strap brackets
|
Details
|
|
|
12-30-2014
|
7.00
|
Riveting tailcone and center section
|
Details
|
|
|
12-29-2014
|
5.00
|
Assembling center section 2
|
Details
|
|
|
12-28-2014
|
5.00
|
Starting to rivet center section
|
Details
|
|
|
12-26-2014
|
5.50
|
Priming center section components
|
Details
|
|
|
12-20-2014
|
4.00
|
Set spacing on passthru spar
|
Details
|
|
|
12-14-2014
|
6.00
|
Began assy of center fuselage
|
Details
|
|
|
12-07-2014
|
4.00
|
Prepping cener seat ribs.
|
Details
|
|
|
12-06-2014
|
4.00
|
Fuselage riveting 2
|
Details
|
|
|
11-26-2014
|
5.50
|
Fuselage riveting 1
|
Details
|
|
|
11-25-2014
|
5.00
|
Riveted the tailhweel assy
|
Details
|
|
|
11-23-2014
|
4.00
|
Priming tailcone skins
|
Details
|
|
|
11-22-2014
|
5.50
|
Prepping tailcone for priming
|
Details
|
|
|
11-16-2014
|
6.50
|
Cleco and drill tailcone
|
Details
|
|
|
11-15-2014
|
4.00
|
Fabricate tailwheel assembly 2
|
Details
|
|
|
11-09-2014
|
6.00
|
Fabricate tailwheel assy
|
Details
|
|
|
11-08-2014
|
6.00
|
Making the big bend
|
Details
|
|
|
11-02-2014
|
2.00
|
Begin initial assembly of tail cone
|
Details
|
|
|
11-01-2014
|
7.00
|
Rearrange shop and fabricate saw horses
|
|
|
|
10-18-2014
|
8.50
|
Rivet F-704 spar feedthru and firewall
|
Details
|
|
|
10-12-2014
|
6.00
|
Rivet fuselage bulkheads thru F-706
|
Details
|
|
|
10-05-2014
|
6.00
|
Primed fuselage bulkheads
|
Details
|
|
|
10-04-2014
|
3.00
|
Final fuselage bulkhead prep
|
Details
|
|
|
09-07-2014
|
5.00
|
F-704 and F-705 bulhead work
|
Details
|
|
|
08-31-2014
|
5.00
|
F-705 bulkhead prep
|
Details
|
|
|
08-27-2014
|
1.00
|
Co-pilot stick grip prep
|
Details
|
|
|
08-17-2014
|
0.25
|
Loose bars on F-704F
|
Details
|
|
|
08-17-2014
|
6.00
|
Firewall bulkhead assy 2
|
Details
|
|
|
08-16-2014
|
4.00
|
Firewall bulkhead assy 1
|
Details
|
|
|
08-13-2014
|
7.50
|
Assemble flap actuaor, elevator bellcrank
|
Details
|
|
|
07-01-2014
|
3.00
|
Parts inventory and sorting
|
Details
|
|
|
06-30-2014
|
3.00
|
Fuse kit arrives!
|
Details
|
|
|
05-05-2014
|
0.10
|
Fuse kit on order
|
Details
|
|