KitLog pro

Powered By Kitlog Pro v2.0

RV-7
Work Logs Found: 117
Category Work Time: 665 Hours
 Date
Hours
Work Log Summary

Details

 04-05-2020
6.00
Weight and Balance
Details
       

 03-12-2020
2.00
New tailwheel fork
Details
       

 12-01-2019
6.00
Rivet on top deck
Details
       

 06-30-2019
8.60
Remove CS plug; start to fit spinner
Details
       

 01-27-2019
6.00
Brake lines, gear leg fairings 1
Details
       

 10-13-2018
2.00
Install rudder cable exit fairings
Details
     

 08-12-2017
6.50
Fit panel center support
Details
       

 01-28-2017
2.00
Static tubing clips
Details
     

 01-02-2017
7.50
Install tailcone top skin 1
Details
       

 07-12-2016
5.00
Flap arm install
Details
       

 05-08-2016
6.70

       

 05-07-2016
7.00
Servo, skin, roll bar
Details
       

 05-01-2016
7.50
Avionics tray
Details
       

 04-30-2016
6.00
Canopy fitup III
Details
       

 04-10-2016
5.00
Canopy fitup II
Details
       

 04-09-2016
6.00
Canopy fitup I
Details
       

 04-02-2016
5.00
Install canopy latch connect
Details
       

 02-21-2016
8.00
Fuel line cover bracket and new fuse cart
Details
       

 02-13-2016
7.50
Roll trim installation
Details
       

 02-07-2016
6.00
Andair fuel filter brackets
       

 01-23-2016
8.50
Fuel pump mounting and plumbing
Details
       

 01-17-2016
8.00
Fuel line install 2
Details
       

 01-16-2016
7.50
Fuel line install 1
Details
       

 01-10-2016
6.00
Cabin and fuel valve
Details
       

 01-03-2016
4.50
Fit forward deck
Details
       

 12-30-2015
5.00
Vent brackets
Details
     

 12-28-2015
6.00
Panel fitup
Details
       

 12-26-2015
5.00
Panel edging 2
Details
       

 12-19-2015
5.00
Panel edging
Details
     

 12-13-2015
7.50
Canopy frame mount brackets 2
Details
       

 12-12-2015
7.00
Canopy frame mount brackets 2
       

 12-06-2015
8.00
Canopy frame mount brackets
Details
       

 12-06-2015
1.00
Canopy frame assembly
Details
       

 11-25-2015
1.00
Canopy frame cleanup
Details
     

 11-24-2015
8.00
Fabricate canopy frame
Details
       

 10-31-2015
4.50
Elevator pushrod fabrication
Details
       

 10-25-2015
7.00
Install tubing for brake lines
Details
       

 10-24-2015
6.50
Right side tank vent.
Details
       

 10-18-2015
7.00
Install control column
Details
       

 09-20-2015
6.00
Wing aft spar install shim, seat pan cover
Details
       

 09-13-2015
7.00
Make fwd cover parts, prime/paint, fit up panel
Details
       

 09-12-2015
5.00
Top skin dimpling 2
Details
     

 09-12-2015
7.50
First wing install!
Details
       

 09-07-2015
7.00
Top skin dimpling 1
Details
       

 09-05-2015
6.00
Seat pan drilling for hinges (redo)
Details
     

 08-30-2015
6.00
Baggage floor install
Details
       

 08-29-2015
7.00
Full baggage panel fitup
Details
       

 08-23-2015
7.60
Baggage back panel completion, nutplate install
Details
       

 08-22-2015
8.00
Fit and drill top skins, baggage side panels, bagg
Details
       

 08-15-2015
7.50
Final assembly of flap housing and elevator bellcr
Details
       

 07-19-2015
6.50
Assembly, fit of flap housing
Details
       

 07-11-2015
6.00
Riveting F-705 and canopy deck
Details
       

 07-05-2015
6.00
Seat fabrication and fuse bracket install
Details
       

 07-04-2015
7.00
Priming and painting seast and crotch strap mounts
Details
       

 07-01-2015
5.00
Flap linkage install and flap housing parts
Details
       

 06-26-2015
7.50
Upper firewall gussets canopy deck
Details
       

 06-13-2015
7.00
Drilling the aft deck
Details
       

 06-07-2015
7.50
Rolling the canoe!
Details
       

 06-06-2015
3.00
Rotisserie prep
Details

 05-31-2015
4.00
Final fuse riveting, part 2
Details
     

 05-17-2015
5.00
Riveting and seat priming
Details

 05-09-2015
5.00
Getting ready for the rotisserie
Details
       

 04-26-2015
6.00
Final fuse riveting, part 1
Details
       

 04-25-2015
8.00
Finishing the seat fit-up
Details
       

 04-19-2015
8.00
Building up the seats
Details
     

 04-12-2015
6.50
Forward fuse riveting, where I can.
Details
     

 04-11-2015
6.00
Loading and tapeing rivets
Details

 03-29-2015
8.00
Fuse reassembly2
Details
       

 03-28-2015
6.00
Fuse reassembly1
Details
       

 03-21-2015
7.50
Fuse reassembly prep
Details
       

 03-15-2015
6.50
Misc. cabin painting and prep
Details
     

 03-14-2015
8.50
Painting the interior cabin surfaces
Details
       

 03-07-2015
8.50
D&D fuse side skins, priming of fwd fuse parts
Details
       

 03-01-2015
5.50
Dimpling, deburring, and prepping fuse skins
Details
       

 02-28-2015
7.00
Fuse disassembly for dimpling, etc
Details
     

 02-21-2015
3.00
Beginning final drilling prior to dipmling
Details
     

 02-08-2015
3.50
Fitting up rudder and brake pedals
Details
       

 02-01-2015
4.00
Riveting brake pedals
Details
       

 01-31-2015
5.00
Forward tank mount stiffeners and brake pedals
Details
     

 01-25-2015
6.50
Drilling firewall to fuse brackets
Details
       

 01-24-2015
6.00
Forward fuse stiffeners and longerons
Details
       

 01-11-2015
6.00
Initial mounting of the firewall
Details
       

 01-04-2015
5.00
Making the conical bends
Details
       

 01-02-2015
6.00
Initial mating of center section and tail cone
Details
       

 01-01-2015
4.50
Drilling crotch strap brackets
Details
       

 12-30-2014
7.00
Riveting tailcone and center section
Details
       

 12-29-2014
5.00
Assembling center section 2
Details
       

 12-28-2014
5.00
Starting to rivet center section
Details
       

 12-26-2014
5.50
Priming center section components
Details
       

 12-20-2014
4.00
Set spacing on passthru spar
Details
       

 12-14-2014
6.00
Began assy of center fuselage
Details
       

 12-07-2014
4.00
Prepping cener seat ribs.
Details
       

 12-06-2014
4.00
Fuselage riveting 2
Details

 11-26-2014
5.50
Fuselage riveting 1
Details

 11-25-2014
5.00
Riveted the tailhweel assy
Details
       

 11-23-2014
4.00
Priming tailcone skins
Details
       

 11-22-2014
5.50
Prepping tailcone for priming
Details
       

 11-16-2014
6.50
Cleco and drill tailcone
Details
       

 11-15-2014
4.00
Fabricate tailwheel assembly 2
Details

 11-09-2014
6.00
Fabricate tailwheel assy
Details
       

 11-08-2014
6.00
Making the big bend
Details
       

 11-02-2014
2.00
Begin initial assembly of tail cone
Details
       

 11-01-2014
7.00
Rearrange shop and fabricate saw horses

 10-18-2014
8.50
Rivet F-704 spar feedthru and firewall
Details
       

 10-12-2014
6.00
Rivet fuselage bulkheads thru F-706
Details
       

 10-05-2014
6.00
Primed fuselage bulkheads
Details
       

 10-04-2014
3.00
Final fuselage bulkhead prep
Details

 09-07-2014
5.00
F-704 and F-705 bulhead work
Details

 08-31-2014
5.00
F-705 bulkhead prep
Details

 08-27-2014
1.00
Co-pilot stick grip prep
Details
       

 08-17-2014
0.25
Loose bars on F-704F
Details
       

 08-17-2014
6.00
Firewall bulkhead assy 2
Details
       

 08-16-2014
4.00
Firewall bulkhead assy 1
Details
       

 08-13-2014
7.50
Assemble flap actuaor, elevator bellcrank
Details
       

 07-01-2014
3.00
Parts inventory and sorting
Details
       

 06-30-2014
3.00
Fuse kit arrives!
Details
       

 05-05-2014
0.10
Fuse kit on order
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.