RV-7
Work Logs Found: 75
Category Work Time: 415 Hours
 Date
Hours
Work Log Summary

Details

 07-08-2018
6.00
Install wheels on landing gear
Details
       

 07-04-2018
2.50
Prepping throttle bracket
Details
       

 06-09-2018
3.00
Targa strip 2
       

 06-03-2018
3.00
Targa strip 1
     

 05-20-2018
8.50
Install aft canopy, vents
       

 05-19-2018
6.00
Tunnel cover, aft canopy install prep
       

 05-06-2018
4.50
Flap positioner
       

 05-05-2018
5.50
Coax and pitot routing
       

 04-28-2018
7.00
Aeilron trim, copilot stick connector redux
       

 04-22-2018
5.50
Install pushrods, tailwheel
       

 04-08-2018
6.00
Add connector for copilot removable stick
       

 02-19-2018
2.50
Apply lettering to panel
       

 02-18-2018
5.50
Fab and install fuel line from fuel flow to firewa
       

 02-11-2018
6.00
Closeout of tunnel, fuel pump, fuel flow
Details
       

 02-10-2018
4.50
Prime panel and terminate fuse block wiring
Details
       

 02-04-2018
4.00
Terminate cable bundle from tunnel to tray
Details
       

 02-03-2018
3.00
Terminate grounds to forest of tabs
Details
       

 01-28-2018
4.50
Lace wiring in tunnel
Details
       

 01-07-2018
6.50
Panel fit-up
Details
     

 01-06-2018
7.50
Fab panel connector bracket and priming
Details
       

 03-12-2017
2.00
Wheel assembly
Details
       

 01-01-2017
6.50
Install canopy positioner
       

 12-30-2016
4.00
Canopy fairing 4
     

 12-29-2016
0.10
Canopy in action
       

 12-29-2016
7.00
Canopy fairing 3
       

 12-28-2016
4.00
Canopy fairing 2
       

 12-26-2016
4.50
Canopy fairing 1
       

 12-11-2016
4.00
Cabin work
       

 12-03-2016
5.50
Canopy fairing complete
       

 11-20-2016
5.00
Canopy fairing, static port, main gear releif
       

 11-19-2016
8.50
Canopy fairing 6 / engine mount
       

 11-13-2016
4.50
Canopy fairing 5
       

 11-06-2016
4.00
Canopy fairing 4
       

 11-01-2016
3.50
Canopy fairing 3
       

 10-29-2016
4.50
Canopy fairing 2
       

 10-23-2016
7.00
Canopy fairing 1 / latch
       

 10-22-2016
8.50
First canopy lift
       

 10-09-2016
6.00
Install avionics shelf
       

 10-08-2016
8.50
Avionics shelf
       

 09-25-2016
7.00
Canopy bonding, Part 1
       

 09-22-2016
7.50
Prep for canopy bonding
       

 09-17-2016
6.00
Rivet canopy frame
       

 09-11-2016
4.00
Canopy frame fit check
       

 09-10-2016
3.50
Pre-rivet canopy frame gussets
     

 09-05-2016
3.50
Priming and painting canopy parts
       

 09-03-2016
3.00
Priming canopy frame
     

 08-28-2016
7.50
Fitting canopy frame gussets
       

 08-27-2016
5.00
Riveting canopy frame and hoop
       

 08-21-2016
4.50
Initial fit of rear canopy
       

 08-20-2016
7.50

       

 08-14-2016
6.00

       

 08-13-2016
8.00

       

 08-11-2016
8.00

       

 08-07-2016
8.00

       

 07-31-2016
7.50

       

 07-30-2016
8.00

       

 07-17-2016
4.50

     

 07-10-2016
5.00

       

 07-03-2016
7.00

       

 06-26-2016
7.50

       

 05-29-2016
6.00

       

 05-22-2016
5.00

       

 05-21-2016
8.00

       

 05-15-2016
6.00

       

 05-14-2016
6.00

       

 03-12-2016
6.50
Rear canopy latch and initial front canopy fit
       

 03-06-2016
8.50
JDAirParts latch 2
       

 03-05-2016
7.50
JDAirParts canopy latch 1
       

 02-28-2016
8.00
Canopy release mechanism 2
       

 02-27-2016
9.00
Pump cover and canopy bearing blocks
       

 02-22-2016
4.00
Storing the finishing kit parts
     

 02-14-2016
4.50
Finishing kit arrives!
       

 02-06-2016
5.00
Priming and painting cabin parts
     

 01-30-2016
3.00
Roll trim prep
     

 11-23-2015
0.10
Ordered finishing kit
Details