Brief Description: Getting ready for the rotisserie
Misc rivet loading and fabrication of the temporary firewall mounting plate for the rotisserie. Drilled and reamed the engine mount holes to 3/16". Fabricated side pieces from 2x3 lumber, match drilled and counterbored the holes. Mounted with AN3 HW and a bunch of for the plywood. Waitng for delivery of the Harbor Freight engine stand to complete the job.