KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  8-4-2018
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Install exhaust stack (first time)

Installed the exhaust stack to the freshly mounted engine. Following plans, the exhaust stud bolts were greased with high temp Permatex anti-sieze paste and set up finger tight. Installed the crossover trombones, also with anti-sieze. Used mouse mik on the ball sockets.

Fabricated and installed all hangars and supports for the pipes near the cowl exit.
' style=

Freash out of the box

Freash out of the box

' style=

In place with hangars and muff

In place with hangars and muff

' style=

Alternate view

Alternate view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.