KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  1-20-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Tunnel wiring

Continued to prep tunnel wiring. Made 0.75 x 0.75 based for the stanfoffs to route the cable bundles in the stiffener cutouts below the fuel pump. Bonded in place on the lower skin; waiting to cure
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.