Date
|
Hours
|
Work Log Summary

|
Details

|
08-09-2009
|
4.00
|
2.- Finilized all cotter pins and safety wire
|
Details
|
 |
|
08-09-2009
|
3.00
|
1.- Fine tuning the cylinder head baffles
|
Details
|
|
|
08-08-2009
|
2.00
|
2.- Weight and Balance Calculation
|
Details
|
|
|
08-08-2009
|
2.00
|
1.- Sealing the firewall
|
Details
|
|
|
08-02-2009
|
3.00
|
Finished up installing safey wire
|
Details
|
|
|
08-01-2009
|
2.00
|
Installed the oil door on the engine cowl
|
Details
|
|
|
08-01-2009
|
2.00
|
Installed the balance cable middle fairlead
|
Details
|
|
|
07-26-2009
|
2.00
|
Riveted the saddle
|
Details
|
|
|
07-26-2009
|
2.00
|
Riveted the front top skin
|
Details
|
|
|
07-26-2009
|
1.00
|
Installed the panel light and glare shield
|
Details
|
|
|
07-25-2009
|
6.00
|
N #
|
Details
|
|
|
07-18-2009
|
2.00
|
Taxi Test #3
|
Details
|
 |
|
07-18-2009
|
2.00
|
2.- Completed Labels
|
Details
|
|
|
07-18-2009
|
2.00
|
1.- Completed Labels
|
Details
|
|
|
07-12-2009
|
2.00
|
3.- Panel Labels (continued)
|
Details
|
|
|
07-12-2009
|
2.00
|
2.- Panel Labels (continued)
|
Details
|
|
|
07-12-2009
|
2.00
|
1.- Panel Labels (continued)
|
Details
|
|
|
07-11-2009
|
6.00
|
Panel Labels
|
Details
|
|
|
07-10-2009
|
0.00
|
EIS is back
|
Details
|
  |
|
07-06-2009
|
0.00
|
Oil pressure and temp reading issue
|
Details
|
  |
|
07-05-2009
|
3.00
|
Wing Tips
|
Details
|
|
|
07-05-2009
|
2.00
|
Foot step fairing
|
Details
|
|
|
07-03-2009
|
1.00
|
2.- TAXI TESTS
|
Details
|
|
|
07-03-2009
|
5.00
|
1.- FIRST ENGINE & TAXI TESTS
|
Details
|
|
|
06-29-2009
|
6.00
|
Hydraulic fluid in brake lines and other
|
Details
|
 |
|
06-28-2009
|
6.00
|
Installed aileron control cables and balance cable
|
Details
|
|
|
06-27-2009
|
4.00
|
Riveted Right Aileron on to Wing
|
Details
|
|
|
06-26-2009
|
4.00
|
Tow Bar
|
Details
|
|
|
06-21-2009
|
2.00
|
2.- Installed Right Flap
|
Details
|
|
|
06-21-2009
|
4.00
|
1.- Installed Left Flap and Aileron
|
Details
|
|
|
06-20-2009
|
2.00
|
Installing the Left Flap
|
Details
|
|
|
06-20-2009
|
3.00
|
2.- Both wing finally installed
|
Details
|
|
|
06-20-2009
|
5.00
|
1.- Final Installation of the wings
|
Details
|
|
|
06-07-2009
|
6.00
|
Hanging the Right Wing
|
Details
|
|
|
06-06-2009
|
8.00
|
Finishing up the electrical connections
|
Details
|
|
|
05-31-2009
|
1.00
|
3.- Close up of Oil Cooler/Lower Cowl and Prop
|
Details
|
|
|
05-31-2009
|
2.00
|
2.- Installing the Propeller
|
Details
|
|
|
05-31-2009
|
3.00
|
1.- Installled the engine cowl
|
Details
|
|
|
05-30-2009
|
2.00
|
2.- Finished connecting the CHT senders
|
Details
|
|
|
05-30-2009
|
3.00
|
1.- Installed the Ram Air Ducts
|
Details
|
|
|
05-24-2009
|
2.00
|
3.- Installed Exhaust, Cabin Heat and Carb Heat mu
|
Details
|
|
|
05-24-2009
|
3.00
|
2.- Finished the Oil Cooler Installation
|
Details
|
|
|
05-24-2009
|
2.00
|
1.- Oil Cooler baffles
|
Details
|
|
|
05-23-2009
|
3.00
|
Oil Overflow and Fuel Line
|
Details
|
|
|
05-23-2009
|
3.00
|
Installing the oil cooler
|
Details
|
|
|
05-16-2009
|
6.00
|
Installing the Cabin Heat Box
|
Details
|
|
|
05-15-2009
|
1.00
|
Installing the Battery and throttle connections
|
Details
|
|
|
05-14-2009
|
1.00
|
Hanging the Enigne1
|
Details
|
|
|
05-14-2009
|
1.00
|
Hanging the Engine4
|
Details
|
|
|
05-14-2009
|
1.00
|
Hanging the Engine3
|
Details
|
|
|
05-14-2009
|
1.00
|
Hanging the Engine2
|
Details
|
|
|
05-09-2009
|
3.00
|
Final installation of throttle mechanism
|
Details
|
|
|
05-03-2009
|
8.00
|
Moving Day 2
|
Details
|
|
|
05-02-2009
|
8.00
|
Moving Day 1
|
Details
|
|
|
04-29-2009
|
2.00
|
Continued work on throttle mechanism
|
Details
|
|
|
04-26-2009
|
6.00
|
Worked on installing the throttle mechanism
|
Details
|
|
|
04-25-2009
|
2.00
|
Engine Mount
|
Details
|
 |
|
04-21-2009
|
2.00
|
ENGINE ARRIVES
|
Details
|
|
|
04-20-2009
|
0.00
|
Upholstery3
|
Details
|
|
|
04-20-2009
|
0.00
|
Upholstery2
|
Details
|
|
|
04-20-2009
|
0.00
|
Upholstery1
|
Details
|
|
|
04-19-2009
|
4.00
|
Upholstery Completed
|
Details
|
|
|
04-10-2009
|
1.00
|
Upholstery Update
|
Details
|
|
|
04-07-2009
|
1.00
|
Upholstery
|
Details
|
|
|
04-05-2009
|
4.00
|
Sanding and priming of the saddle
|
Details
|
|
|
04-04-2009
|
4.00
|
Sanding the saddle
|
Details
|
 |
|
03-28-2009
|
4.00
|
Moving the Fuselage to the Upholstery Shop
|
Details
|
|
|
03-27-2009
|
2.00
|
Getting ready for upholstery
|
Details
|
 |
|
03-21-2009
|
1.00
|
Upholstery
|
Details
|
  |
|
03-14-2009
|
2.00
|
Control Cable fairings and other stuff
|
Details
|
|
|
03-01-2009
|
7.00
|
Riveting the Left Aileron.
|
Details
|
|
|
02-27-2009
|
0.00
|
Ordered the engine
|
Details
|
  |
|
02-22-2009
|
7.00
|
Left Aileron & Trim
|
Details
|
|
|
02-21-2009
|
7.00
|
Right Aileron
|
Details
|
|
|
02-15-2009
|
1.00
|
Bending the Aileron Skin 3
|
Details
|
|
|
02-15-2009
|
2.00
|
Bending the Aileron Skin 2
|
Details
|
|
|
02-15-2009
|
3.00
|
Bending the Aileron Skin 1
|
Details
|
|
|
02-14-2009
|
6.00
|
Riveted Right Flap
|
Details
|
|
|
02-10-2009
|
0.00
|
T-storm
|
Details
|
|
|
02-07-2009
|
6.00
|
Riveting of the Left Flap
|
Details
|
|
|
02-01-2009
|
4.00
|
Drilling Left Flap Ribs
|
Details
|
|
|
01-31-2009
|
6.00
|
Left Aileron Trim
|
Details
|
|
|
01-31-2009
|
1.00
|
Bending the Flap Skin 4
|
Details
|
|
|
01-31-2009
|
2.00
|
Bending the Flap Skin 3
|
Details
|
|
|
01-31-2009
|
2.00
|
Bending the Flap Skin 2
|
Details
|
|
|
01-31-2009
|
2.00
|
Bending the Flap Skin 1
|
Details
|
|
|
01-28-2009
|
0.00
|
Change of Plans
|
Details
|
  |
|
01-11-2009
|
1.00
|
Flap Skin SNAFU
|
Details
|
|
|
01-10-2009
|
4.00
|
Bending the Flap skin
|
Details
|
|
|
01-08-2009
|
1.00
|
Preparing to bend the Right Flap Skin
|
Details
|
|
|
01-07-2009
|
1.00
|
Fabricated the Aileron tips
|
Details
|
|
|
01-06-2009
|
1.00
|
Fabricating the aileron ribs
|
Details
|
|
|
01-04-2009
|
5.00
|
Fabricating Flap Ribs
|
Details
|
|
|
01-03-2009
|
6.00
|
Continued work on wings
|
Details
|
|
|
01-02-2009
|
6.00
|
Hanging the left wing
|
Details
|
|
|
01-01-2009
|
6.00
|
Preparing ot Hang the Right Wing
|
Details
|
|
|
01-01-2009
|
3.00
|
2.- Hanging the right wing
|
|
|
|
12-30-2008
|
3.00
|
2.- First steps of the wing mating process
|
Details
|
|
|
12-30-2008
|
3.00
|
1.- Preparing for wing installation
|
Details
|
|
|
12-29-2008
|
5.00
|
Completion of the Right wing
|
Details
|
|
|
12-28-2008
|
6.00
|
Installing Fuel sender
|
Details
|
|
|
12-27-2008
|
3.00
|
2.- Riveting the bottom skin (Right Wing)
|
Details
|
|
|
12-27-2008
|
3.00
|
1.- Preparing to rivet the bottom skin
|
Details
|
|
|
12-26-2008
|
2.00
|
LRI installation (continued) and strobe/nav lights
|
Details
|
|
|
12-24-2008
|
5.00
|
Installing LRI and other stuff
|
Details
|
|
|
12-23-2008
|
6.00
|
Fuel Tank and Wing tip (right wing)
|
Details
|
|
|
12-21-2008
|
6.00
|
Drilling the Leading edge skin (right)
|
Details
|
|
|
12-20-2008
|
0.00
|
Storing the wings
|
Details
|
 |
|
12-20-2008
|
6.00
|
Cutting and Bending the Right Leading Edge Skin
|
Details
|
|
|
12-14-2008
|
4.00
|
2.- Drilled the Rear Bottom Skin (Right Wiing)
|
Details
|
|
|
12-14-2008
|
2.00
|
1.- Cutting the rear bottom skin (Right Wing)
|
Details
|
|
|
12-13-2008
|
5.00
|
Riveted the Rear Top Skin (Right Wing)
|
Details
|
|
|
12-12-2008
|
5.00
|
Rear top skin (Right Wing)
|
Details
|
|
|
12-06-2008
|
5.00
|
Riveting the Right Wing Ribs
|
Details
|
|
|
11-30-2008
|
3.00
|
Rear channel splice and rear ribs
|
Details
|
|
|
11-28-2008
|
4.00
|
Started wing #2 (Right wing)
|
Details
|
|
|
11-27-2008
|
2.00
|
Nav lights and Strobe Lights
|
Details
|
 |
|
11-26-2008
|
2.00
|
3.- Closing the wing (part 4)
|
Details
|
|
|
11-26-2008
|
2.00
|
2.- Closing the wing (part 3)
|
Details
|
|
|
11-26-2008
|
1.00
|
1.- Closing the wing (part 2)
|
Details
|
|
|
11-23-2008
|
2.00
|
2.- Closing the wing (part 1)
|
Details
|
|
|
11-23-2008
|
2.00
|
1.- Aileron access panel and other stuff
|
Details
|
|
|
11-22-2008
|
5.00
|
Pitot tube, fuel tank access panel
|
Details
|
|
|
11-16-2008
|
2.00
|
3.- Installed fuel sender
|
Details
|
|
|
11-16-2008
|
2.00
|
2.- Fuel Sender
|
Details
|
|
|
11-16-2008
|
2.00
|
1.- Installing the fuel cap
|
Details
|
|
|
11-15-2008
|
2.00
|
2.- Installed Landing light (cont)
|
|
|
|
11-15-2008
|
2.00
|
1.- Installing the landing light
|
Details
|
|
|
11-09-2008
|
4.00
|
Fuel Tank & Landing Light
|
Details
|
|
|
11-08-2008
|
3.00
|
2.- Wing tip and Bell-crank access
|
Details
|
|
|
11-08-2008
|
3.00
|
1.- Wing Tip
|
Details
|
|
|
11-02-2008
|
5.00
|
Drilling the leading edge (cont)
|
Details
|
|
|
10-26-2008
|
1.00
|
2.- Drilling the Leading Egde
|
Details
|
|
|
10-26-2008
|
2.00
|
1.- Drilling the Leading Edge
|
Details
|
|
|
10-25-2008
|
1.00
|
3.- Bending the Leading Edge Skin
|
Details
|
|
|
10-25-2008
|
1.00
|
2.- Bending the Leading Edge Skin
|
Details
|
|
|
10-25-2008
|
2.00
|
1.- Bending the Leading Edge Skin
|
Details
|
|
|
10-19-2008
|
6.00
|
Cut and drilled the rear bottom skin
|
Details
|
|
|
10-18-2008
|
4.00
|
Riveted the rear top skin
|
Details
|
|
|
10-12-2008
|
5.00
|
Drilling Rear top skin
|
Details
|
|
|
10-11-2008
|
5.00
|
Rear top skin (left)
|
Details
|
|
|
10-04-2008
|
4.00
|
Drilling rear spar to ribs
|
Details
|
|
|
09-28-2008
|
5.00
|
Drilling the rear ribs onto the wing spar
|
Details
|
|
|
09-27-2008
|
4.00
|
Installed the bellcrank support on Rib 7
|
Details
|
|
|
09-22-2008
|
1.00
|
Preliminary fit of rear ribs
|
|
|
|
09-21-2008
|
2.00
|
Rear spar splice
|
Details
|
|
|
09-20-2008
|
3.00
|
Fabricating the wing spars tip
|
Details
|
|
|
09-14-2008
|
4.00
|
Rear ribs lightening holes
|
Details
|
|
|
09-13-2008
|
3.00
|
Nose ribs lightening holes
|
Details
|
|
|
09-12-2008
|
10.00
|
Formed the rest of the rear wing ribs
|
Details
|
|
|
09-01-2008
|
4.00
|
Forming Ribs 9 & 7
|
Details
|
|
|
08-31-2008
|
6.00
|
Forming nose ribs
|
Details
|
|
|
08-30-2008
|
5.00
|
Cutting the rib blanks
|
Details
|
|
|
08-26-2008
|
1.00
|
Nose ribs form block
|
Details
|
|
|
08-24-2008
|
6.00
|
Rear rib form blocks
|
Details
|
|
|
08-23-2008
|
2.00
|
Rib#1 forming block
|
Details
|
 |
|
08-23-2008
|
5.00
|
2.- Forming blocks for Ribs 1- 3
|
Details
|
|
|
08-23-2008
|
1.00
|
1.- Final touches on the saddle
|
Details
|
|
|
08-22-2008
|
1.00
|
2.- Saddle - applying resin
|
Details
|
|
|
08-22-2008
|
1.00
|
1.- Saddle - Preparing for resin
|
Details
|
|
|
08-20-2008
|
2.00
|
Ready to apply the fiber glass/resin
|
Details
|
|
|
08-20-2008
|
4.00
|
Creating a mold for the saddle
|
Details
|
|
|
08-11-2008
|
1.00
|
Canopy front side flashings
|
Details
|
|
|
08-09-2008
|
1.00
|
4.- Riveting the side flashings
|
Details
|
|
|
08-09-2008
|
2.00
|
3.- Installing the canopy
|
Details
|
|
|
08-09-2008
|
2.00
|
2,- Installing the canopy
|
Details
|
|
|
08-09-2008
|
3.00
|
1,- Painting the inside flashing/canopy frame
|
Details
|
|
|
08-04-2008
|
2.00
|
Installing latch cable system
|
Details
|
|
|
08-03-2008
|
3.00
|
Canopy Latch System
|
Details
|
|
|
08-03-2008
|
2.00
|
Canopy Latch
|
Details
|
|
|
08-02-2008
|
4.00
|
Canopy side frames
|
Details
|
|
|
08-01-2008
|
2.00
|
More fine tunning of the canopy
|
Details
|
|
|
07-29-2008
|
3.00
|
Drilling the canopy onto the tube frame
|
Details
|
|
|
07-28-2008
|
2.00
|
Fine tunning the canopy tube frames
|
Details
|
 |
|
07-27-2008
|
3.00
|
2.- First test fit of canopy
|
Details
|
|
|
07-27-2008
|
1.00
|
1.- L angles and Z angles on top middle skin
|
Details
|
 |
|
07-26-2008
|
3.00
|
Installing Tube frame
|
Details
|
|
|
07-25-2008
|
1.00
|
Installed Air Vents
|
Details
|
 |
|
07-23-2008
|
0.00
|
Testing XM Receiver with Hurricane Dolly
|
Details
|
|
|
07-20-2008
|
2.00
|
Installed XM Weather
|
Details
|
 |
|
07-19-2008
|
3.00
|
Installed Autopilot Servo
|
Details
|
|
|
07-18-2008
|
1.00
|
Installed Transponder Antenna
|
Details
|
  |
|
07-13-2008
|
3.00
|
Installed Panel Lights
|
Details
|
|
|
07-13-2008
|
1.00
|
2.- Installing the Fuel Gascolator
|
Details
|
|
|
07-13-2008
|
3.00
|
1.- Installing Fuel System Inside Cabin
|
Details
|
|
|
07-12-2008
|
4.00
|
Installed Grips
|
Details
|
 |
|
07-07-2008
|
1.00
|
Installed fuel selector valve on panel
|
Details
|
|
|
07-03-2008
|
3.00
|
2.- Master on .. it's alive !
|
Details
|
|
|
07-03-2008
|
2.00
|
1.- Installing Pilort's Intercom wire harness
|
Details
|
|
|
06-29-2008
|
4.00
|
Wiring Flap Motor
|
Details
|
|
|
06-28-2008
|
4.00
|
Installing Instruments
|
Details
|
|
|
06-25-2008
|
1.00
|
2.- Final assembly of Instrument Panel
|
Details
|
|
|
06-25-2008
|
1.00
|
1.- Final Assembly of Instrument Panel
|
Details
|
|
|
06-23-2008
|
2.00
|
Painting the sub panels - again
|
Details
|
 |
|
06-22-2008
|
5.00
|
Painting the Instrument Panel/others
|
Details
|
|
|
06-21-2008
|
5.00
|
Preparing to paint the panel
|
Details
|
|
|
06-15-2008
|
2.00
|
2.- Side panels
|
Details
|
|
|
06-15-2008
|
5.00
|
1.- Side panels
|
Details
|
|
|
06-14-2008
|
4.00
|
Side panels
|
Details
|
|
|
06-08-2008
|
3.00
|
Installing the circuit breakers
|
Details
|
|
|
06-07-2008
|
3.00
|
Installing Radio Stack
|
Details
|
 |
|
06-01-2008
|
1.00
|
2.- Instruments
|
Details
|
|
|
06-01-2008
|
3.00
|
1.- Continued work on instrument panel
|
Details
|
|
|
05-31-2008
|
3.00
|
2.- Instrument Panel
|
Details
|
|
|
05-31-2008
|
2.00
|
1.- Radio stack
|
Details
|
|
|
05-30-2008
|
2.00
|
Instrument Panel (Comm and Transponder
|
Details
|
|
|
05-28-2008
|
0.00
|
Received Grand Rapids shipment
|
Details
|
|
|
05-26-2008
|
3.00
|
Re enforced the antenna support
|
Details
|
|
|
05-26-2008
|
1.00
|
ELT Installation
|
Details
|
|
|
05-25-2008
|
3.00
|
Installing tail light
|
Details
|
|
|
05-25-2008
|
2.00
|
Installed Elevator stops
|
Details
|
|
|
05-24-2008
|
3.00
|
Riveted Horizontal Stabilizer Tips
|
Details
|
  |
|
05-23-2008
|
0.00
|
Received LRI shipment
|
Details
|
  |
|
05-22-2008
|
0.00
|
Received Aircraft Spruce Shipment
|
Details
|
  |
|
05-20-2008
|
0.00
|
Ordered LRI
|
Details
|
  |
|
05-19-2008
|
0.00
|
Ordered Instruments and Avionics
|
Details
|
  |
|
05-18-2008
|
3.00
|
Installed Com Antenna
|
Details
|
 |
|
05-12-2008
|
1.00
|
Received Spars back from Machine Shop
|
Details
|
|
|
05-11-2008
|
3.00
|
Top Forward Skin
|
Details
|
|
|
05-09-2008
|
2.00
|
Removed center spar
|
Details
|
|
|
05-04-2008
|
1.00
|
5.-Test fit of the wing spars
|
Details
|
|
|
05-04-2008
|
2.00
|
4.- Making space for the fuselage
|
Details
|
|
|
05-04-2008
|
2.00
|
3.- Leaving the Womb
|
Details
|
|
|
05-04-2008
|
2.00
|
2.- Installing the main spring gear
|
Details
|
|
|
05-04-2008
|
3.00
|
1.- Installing main wheels
|
Details
|
|
|
05-03-2008
|
2.00
|
Packing the wheel bearings
|
Details
|
|
|
05-02-2008
|
3.00
|
Preparing to install the main wheels
|
Details
|
|
|
04-29-2008
|
1.00
|
Drilling Main Gear Axles
|
Details
|
|
|
04-28-2008
|
1.00
|
2.- Installing the Bungee Cord
|
Details
|
|
|
04-28-2008
|
3.00
|
1.- Installing Front Wheel
|
Details
|
|
|
04-27-2008
|
3.00
|
Fine tuning of Rudder installation & Front wheel
|
Details
|
|
|
04-26-2008
|
2.00
|
Installing the Rudder
|
Details
|
|
|
04-26-2008
|
2.00
|
2.- Riveting the top skins and the rest!
|
Details
|
|
|
04-26-2008
|
6.00
|
1.- Getting ready to rivet the top skins
|
Details
|
|
|
04-25-2008
|
2.00
|
2.- Installing turn-buckles
|
Details
|
|
|
04-25-2008
|
1.00
|
1.- Installing a PVC pipe for future electical wir
|
Details
|
|
|
04-25-2008
|
6.00
|
1.- Control cables (elevator)
|
Details
|
|
|
04-24-2008
|
3.00
|
Preparing for Stabilizer Install
|
Details
|
|
|
04-20-2008
|
6.00
|
Installing Canopy Frame
|
Details
|
|
|
04-19-2008
|
6.00
|
Finished drilling the top skin/tube frames
|
Details
|
 |
|
04-18-2008
|
1.00
|
2.- Triming the Middle top skin for 2nd tube frame
|
Details
|
|
|
04-18-2008
|
1.00
|
1.- Installing the L angle under first tube frame
|
Details
|
|
|
04-17-2008
|
0.00
|
Picture moment
|
Details
|
|
|
04-15-2008
|
2.00
|
Drilling the Middle top skin
|
Details
|
|
|
04-14-2008
|
3.00
|
Installed First Tube Frame
|
Details
|
|
|
04-13-2008
|
3.00
|
2.- Drilling the rear top skin
|
Details
|
|
|
04-13-2008
|
3.00
|
1.- Installing the rear top skin
|
Details
|
|
|
04-12-2008
|
3.00
|
2.- Riveted the Luggage compartment into place
|
Details
|
|
|
04-12-2008
|
3.00
|
1.- Drilled the Steps in place
|
Details
|
|
|
04-06-2008
|
4.00
|
Drilled the forward top longeron doublers
|
Details
|
|
|
04-05-2008
|
2.00
|
2.- Flap control tubes
|
Details
|
|
|
04-05-2008
|
4.00
|
1.- Installing Flap Motor and control tubes
|
Details
|
|
|
04-02-2008
|
0.00
|
Time Warp !
|
Details
|
|
|
04-01-2008
|
0.00
|
Photo opportunity
|
Details
|
|
|
03-31-2008
|
3.00
|
Riveting the Forward Side Skins
|
Details
|
|
|
03-30-2008
|
3.00
|
Joining of the Rear and Forward Fuselage
|
Details
|
|
|
03-29-2008
|
4.00
|
Installing front gear push rods
|
Details
|
|
|
03-28-2008
|
5.00
|
Riveted Firwall and seat back support
|
Details
|
|
|
03-27-2008
|
5.00
|
Insulating the firewall and installed boots
|
Details
|
|
|
03-26-2008
|
6.00
|
Continued work on brakes and cabin floor
|
Details
|
|
|
03-25-2008
|
1.00
|
Installing brake pedals
|
Details
|
 |
|
03-24-2008
|
2.00
|
Powder coating more parts
|
Details
|
 |
|
03-23-2008
|
4.00
|
Riveting the forward fuselage floor/Center Spar
|
Details
|
|
|
03-22-2008
|
4.00
|
2.- Riveting the Seat Back Support
|
Details
|
|
|
03-21-2008
|
3.00
|
1.- Riveting the Seat Back Support
|
Details
|
|
|
03-18-2008
|
2.00
|
Drilling arm rest side panels
|
Details
|
|
|
03-16-2008
|
4.00
|
Wing spar attachment bolts access panels
|
Details
|
|
|
03-15-2008
|
4.00
|
Riveting the luggage floor skin
|
Details
|
|
|
03-09-2008
|
3.00
|
2.- Torque tube forward bearing
|
Details
|
|
|
03-09-2008
|
3.00
|
1.- Drilled the wing attachments upright o/b holes
|
Details
|
|
|
03-08-2008
|
3.00
|
L angles
|
Details
|
|
|
03-02-2008
|
5.00
|
Drilled center seat channel & flap control mount
|
Details
|
|
|
03-01-2008
|
3.00
|
Drilled the luggage floor to L angles.
|
Details
|
|
|
02-23-2008
|
4.00
|
Installed L angles for Luggage Compartment
|
Details
|
|
|
02-22-2008
|
3.00
|
2.- Riveting the rear fuselage
|
Details
|
|
|
02-22-2008
|
4.00
|
1.- Riveting the rear fuselage
|
Details
|
|
|
02-17-2008
|
0.00
|
Got sick as a dog!
|
Details
|
  |
|
02-16-2008
|
4.00
|
Bottom Fuselage Access Door
|
Details
|
|
|
02-15-2008
|
3.00
|
Running out of Clecos!
|
Details
|
|
|
02-10-2008
|
6.00
|
Side skin L angles and seat supports
|
Details
|
|
|
02-06-2008
|
1.00
|
Drilled the Wing Attachment Uprights
|
Details
|
|
|
02-03-2008
|
3.00
|
Drilled Bulkheads
|
|
|
|
02-02-2008
|
3.00
|
Drilled Uprights
|
Details
|
|
|
02-01-2008
|
3.00
|
Side skins
|
Details
|
|
|
01-31-2008
|
1.00
|
Installed Instrument Panel
|
Details
|
|
|
01-27-2008
|
3.00
|
Installing the back channel
|
Details
|
|
|
01-26-2008
|
4.00
|
Drilling the firewall to the cabin floor
|
Details
|
|
|
01-25-2008
|
2.00
|
Joining the Cabin floor and the center fuselage
|
Details
|
|
|
01-23-2008
|
3.00
|
Cabin Floor and Center Spar
|
Details
|
|
|
01-22-2008
|
3.00
|
Cabin Floor
|
Details
|
|
|
01-21-2008
|
3.00
|
Firewall riveting
|
Details
|
|
|
01-20-2008
|
4.00
|
Upper and Lower bearings
|
Details
|
|
|
01-19-2008
|
3.00
|
Fixing boboo
|
Details
|
|
|
01-18-2008
|
3.00
|
Solution to the problem
|
Details
|
|
|
01-17-2008
|
1.00
|
Boboo !
|
Details
|
|
|
01-16-2008
|
3.00
|
Upper bearing
|
Details
|
|
|
01-15-2008
|
2.00
|
Continued work on Firewall
|
Details
|
|
|
01-13-2008
|
5.00
|
Drilled upper engine mounts.
|
Details
|
|
|
01-12-2008
|
4.00
|
Firewall Center Channel
|
Details
|
|
|
01-11-2008
|
3.00
|
Drilled Gear Channel and seat support
|
Details
|
|
|
01-05-2008
|
4.00
|
HT attachment brackets and cable fairing
|
Details
|
|
|
01-04-2008
|
2.00
|
Drilling rear panel top
|
Details
|
|
|
01-03-2008
|
2.00
|
Drilled the bottom longeron to side skins
|
Details
|
|
|
01-01-2008
|
5.00
|
Rear fuselage side skins assembly
|
Details
|
|
|
12-31-2007
|
2.00
|
Riveted the Rear Fuselage Bottom Skin
|
Details
|
|
|
12-31-2007
|
1.00
|
Rear Fuselage Access Door
|
Details
|
|
|
12-31-2007
|
2.00
|
Continued work on rear fuselage floor
|
Details
|
|
|
12-30-2007
|
3.00
|
Fuselage rear floor - L and Z angles
|
Details
|
|
|
12-30-2007
|
2.00
|
Bottom Rudder Hinge
|
Details
|
|
|
12-29-2007
|
0.00
|
Zenith parts shipment arrives
|
Details
|
|
|
12-28-2007
|
2.00
|
START of Assembly
|
Details
|
|
|
12-26-2007
|
2.00
|
Fuselage access door
|
Details
|
|
|
12-26-2007
|
3.00
|
Fabricated L angles
|
Details
|
|
|
12-22-2007
|
4.00
|
Clean up work
|
Details
|
|
|
12-21-2007
|
3.00
|
Center Channel Support
|
Details
|
|
|
12-21-2007
|
3.00
|
Arm rest and Center Console
|
Details
|
|
|
12-19-2007
|
1.00
|
Gusset
|
Details
|
|
|
12-18-2007
|
1.00
|
Seat back side channel
|
Details
|
 |
|
12-16-2007
|
3.00
|
2.- Lower Bearing Support
|
Details
|
|
|
12-16-2007
|
3.00
|
1.- Cabin Floor & Rear, Middle Top Skins
|
Details
|
|
|
12-15-2007
|
3.00
|
Fuselage Rear Side Skins
|
Details
|
|
|
12-11-2007
|
2.00
|
Rudder Horn
|
Details
|
 |
|
12-09-2007
|
1.00
|
3.- Cut Rear panel (top)
|
Details
|
 |
|
12-09-2007
|
2.00
|
2.- Forming the Instrument Panel
|
Details
|
|
|
12-09-2007
|
2.00
|
1.- Forming the Instrument Panel
|
Details
|
|
|
12-08-2007
|
3.00
|
Bulkhead Lightening holes
|
Details
|
 |
|
12-02-2007
|
3.00
|
Baggage Back Bulkhead
|
Details
|
|
|
12-01-2007
|
3.00
|
Middle Bulkhead
|
Details
|
|
|
11-25-2007
|
0.00
|
2.- Forming Aft bulkhead
|
Details
|
|
|
11-25-2007
|
3.00
|
1.- Forming Aft bulkhead
|
Details
|
|
|
11-24-2007
|
2.00
|
Fuselage bottom skin
|
Details
|
 |
|
11-23-2007
|
1.00
|
Preparing to cut Fuselage floor skin
|
Details
|
|
|
11-10-2007
|
3.00
|
making more 032 parts
|
|
 |
|
11-03-2007
|
0.00
|
Sold Old XL again !
|
Details
|
 |
|
10-28-2007
|
4.00
|
Fabrication of .032 parts
|
Details
|
 |
|
10-21-2007
|
1.00
|
Wing attachment doublers
|
Details
|
|
|
10-20-2007
|
2.00
|
Firewall Stiffener Doubler
|
Details
|
|
|
10-16-2007
|
1.00
|
Firewall top Stiffener (front)
|
|
|
|
10-05-2007
|
1.00
|
Firewall Bottom Stiffener
|
Details
|
 |
|
10-02-2007
|
2.00
|
More .040" parts
|
Details
|
 |
|
09-29-2007
|
4.00
|
Many Small Parts 0.040
|
Details
|
|
|
09-23-2007
|
4.00
|
Longeron Doublers
|
Details
|
 |
|
09-22-2007
|
0.00
|
Wings Spars (Assembled)
|
Details
|
|
|
09-16-2007
|
3.00
|
Drilled Wing Attachements Holes (Left Spar)
|
Details
|
|
|
09-15-2007
|
2.00
|
2.- Drilling the Wing Attachment Holes (Right Spar
|
Details
|
|
|
09-15-2007
|
2.00
|
1.- Preparing to Drill Wing Spar Attachment Holes
|
Details
|
|
|
09-07-2007
|
3.00
|
Completed the Right Wing Spar
|
Details
|
|
|
09-06-2007
|
2.00
|
Started Riveting Right Wing Spar
|
Details
|
|
|
09-04-2007
|
1.00
|
Getting ready to rivet Right Wing Spar
|
Details
|
  |
|
09-01-2007
|
1.00
|
Finishing small items on Right Wing Spar
|
Details
|
 |
|
08-30-2007
|
2.00
|
Drilled Hat Stiffeners and Nose Rib Angles
|
Details
|
|
|
08-29-2007
|
2.00
|
Continued work in Right Wing Spar
|
Details
|
 |
|
08-26-2007
|
2.00
|
Continued work on Spar Caps
|
Details
|
 |
|
08-25-2007
|
2.00
|
Started the Right Wing Spar
|
Details
|
|
|
08-24-2007
|
0.00
|
Test fit of Left Wing Spar and Center Spar
|
Details
|
|
|
08-16-2007
|
3.00
|
Completed Left Wing Spar
|
Details
|
|
|
08-16-2007
|
1.00
|
2.- Finished riveting the small parts
|
Details
|
|
|
08-16-2007
|
3.00
|
1.- Started Riveting the wing spar
|
Details
|
|
|
08-14-2007
|
3.00
|
Primed Spar caps/partial assembly of wing spar
|
Details
|
|
|
08-13-2007
|
2.00
|
Deburred and primed the spar web
|
Details
|
|
|
08-12-2007
|
2.00
|
2.- Drilled Hat Stiffeners and Nose Rib Angles
|
Details
|
|
|
08-12-2007
|
3.00
|
1.- Wing spar lightenning hole
|
Details
|
|
|
08-11-2007
|
2.00
|
2.- Formed Nose Rib Angles
|
Details
|
|
|
08-11-2007
|
1.00
|
1.- Fabricated hat stiffeners
|
Details
|
|
|
08-10-2007
|
2.00
|
Drilled Upper Front Spar Cap
|
Details
|
|
|
08-08-2007
|
3.00
|
Drilled Lower Front Spar Cap
|
Details
|
|
|
08-07-2007
|
2.00
|
Drilled Upper Rear Spar Cap
|
Details
|
|
|
08-06-2007
|
2.00
|
Drilled Lower Rear Spar Cap
|
Details
|
|
|
08-05-2007
|
2.00
|
Cutting Spar Caps for Left Wing
|
Details
|
|
|
08-04-2007
|
4.00
|
Completed the Center Spar
|
Details
|
|
|
08-03-2007
|
2.00
|
Finished the Center Spar Spacers
|
Details
|
 |
|
08-02-2007
|
2.00
|
Drilled out the center spar spacers
|
Details
|
|
|
08-01-2007
|
0.00
|
Finally received lathe's drill chuck
|
Details
|
|
|
07-29-2007
|
3.00
|
Riveted the Front section of the center spar
|
Details
|
|
|
07-28-2007
|
4.00
|
Finally got the riveting right!
|
Details
|
|
|
07-26-2007
|
1.00
|
Drilling out bad solid rivets
|
Details
|
|
|
07-22-2007
|
1.00
|
3.- Riveting of the Center Spar
|
Details
|
|
|
07-22-2007
|
4.00
|
2.- Getting ready to Rivet the Center Spar
|
Details
|
|
|
07-22-2007
|
3.00
|
1.- Second test trial on solid riveting
|
Details
|
|
|
07-21-2007
|
2.00
|
Setup working table for Center Spar Drilling
|
Details
|
 |
|
07-15-2007
|
1.00
|
Finished forming the Center Spar Lightening Holes
|
Details
|
|
|
07-14-2007
|
0.00
|
Picked up F.95 and F.115 Flanging Dies
|
Details
|
|
|
07-08-2007
|
3.00
|
Drilled Pilot Holes on the wing spar webs
|
Details
|
|
|
07-07-2007
|
2.00
|
Measuring and laying out rivet pattern for wing sp
|
Details
|
|
|
07-06-2007
|
2.00
|
Cutting the Wing Spar Webs
|
Details
|
|
|
07-04-2007
|
1.00
|
2.- Cut lightening holes on center spar webs
|
Details
|
|
|
07-04-2007
|
1.00
|
1.- Cut lightening holes on center spar webs
|
Details
|
|
|
07-01-2007
|
4.00
|
Drilled Center Spar Caps
|
Details
|
|
|
06-30-2007
|
3.00
|
Bending the Center Spar Webs
|
Details
|
|
|
06-23-2007
|
3.00
|
Cutting and bending the center spar webs
|
Details
|
|
|
06-22-2007
|
1.00
|
Cutting Aluminum for Spar Cap Angles
|
Details
|
 |
|
06-21-2007
|
2.00
|
Bending the wing spar cap angles
|
Details
|
|
|
06-17-2007
|
5.00
|
Re arranged work area
|
Details
|
|
|
06-02-2007
|
0.00
|
EAA SWRFI
|
Details
|
|
|
06-01-2007
|
0.00
|
EAA SWRFI
|
Details
|
|
|
05-17-2007
|
2.00
|
Riveted the elevator
|
Details
|
|
|
05-16-2007
|
2.00
|
Servo Installation, Debured and Primed Elevator
|
Details
|
|
|
05-15-2007
|
1.00
|
Fabricated the elevator trim horn Fabricated the h
|
Details
|
|
|
05-14-2007
|
1.00
|
Cutout through Channel for elevator trim horn
|
Details
|
|
|
05-13-2007
|
2.00
|
Fabricated the Elevator trim
|
Details
|
|
|
05-13-2007
|
1.00
|
Drilled the elevator trim into place
|
Details
|
|
|
05-12-2007
|
2.00
|
Elevator cutout channel
|
Details
|
|
|
05-11-2007
|
1.00
|
Cutout for Elevator Trim
|
Details
|
|
|
05-07-2007
|
2.00
|
The mating of Horizontal Stabilizer and the Elevat
|
Details
|
|
|
05-06-2007
|
3.00
|
Cutout for rudder on elevator
|
Details
|
|
|
05-05-2007
|
3.00
|
Drilled Elevator Horns into place
|
Details
|
|
|
05-04-2007
|
5.00
|
Fabricated Lower Elevator horn and doubler
|
Details
|
|
|
05-03-2007
|
2.00
|
Drilled upper elevator skin
|
Details
|
|
|
05-02-2007
|
1.00
|
Set pitch on upper elevator skin
|
Details
|
  |
|
05-01-2007
|
2.00
|
Drilled lower elevator skin
|
Details
|
|
|
04-30-2007
|
1.00
|
Fabricated an additional rib for the elevator
|
Details
|
|
|
04-29-2007
|
1.00
|
2.- Riveted Center channel to the center Ribs (ele
|
Details
|
|
|
04-29-2007
|
1.00
|
1.- Bent the elevator skin
|
Details
|
|
|
04-27-2007
|
0.00
|
Picked up more Aluminum
|
Details
|
  |
|
04-25-2007
|
2.00
|
Riveted the Rudder
|
Details
|
|
|
04-24-2007
|
1.00
|
Deburred and Primed Rudder
|
Details
|
  |
|
04-22-2007
|
2.00
|
Drilled Rudder's Leading edge skin
|
Details
|
|
|
04-12-2007
|
2.00
|
Bent and Trimmed the Rudder's Trailing Edge Skin
|
Details
|
|
|
04-11-2007
|
1.00
|
Riveted the Rudder Ribs to the spar Spar
|
Details
|
|
|
04-10-2007
|
1.00
|
Deburred, cleaned and primed rudder ribs and spar
|
Details
|
  |
|
04-09-2007
|
1.00
|
Drilled Rudder Spar Doublers
|
Details
|
|
|
04-09-2007
|
1.00
|
Drilled Rudder Ribs to Spar
|
Details
|
|
|
04-08-2007
|
2.00
|
Rudder Front Rib
|
Details
|
|
|
04-08-2007
|
2.00
|
Rudder Front Rib
|
Details
|
|
|
04-08-2007
|
2.00
|
Rudder Spar
|
Details
|
|
|
04-07-2007
|
3.00
|
Riveted the upper Stabilizer skin
|
Details
|
|
|
04-07-2007
|
2.00
|
Form Templates for Rudder Ribs
|
Details
|
|
|
04-05-2007
|
3.00
|
Drilled Stabilizer Upper Skin
|
Details
|
 |
|
04-02-2007
|
2.00
|
Riveted Lower Stabilizer Skin
|
Details
|
|
|
04-01-2007
|
5.00
|
Drilled upper Skin to Horizontal Stabilizer
|
Details
|
|
|
03-30-2007
|
2.00
|
Riveted Horizontal Stabilizer Skeleton
|
Details
|
|
|
03-29-2007
|
2.00
|
Deburred Horizontal stabilizer Spar and Ribs
|
Details
|
 |
|
03-27-2007
|
1.00
|
Drilled Horizontal Stabilizer Ribs to Rear Spar
|
Details
|
|
|
03-26-2007
|
1.00
|
Drilled Horizontal Stabilizer ribs onto Front Spar
|
Details
|
|
|
03-25-2007
|
4.00
|
Starting assembly of Horizontal Stabilizer
|
Details
|
|
|
03-24-2007
|
4.00
|
Horizontal Stabilizer Rear Spar Attachment Plate
|
Details
|
 |
|
03-23-2007
|
1.00
|
Horizontal Stabilizer Front Spar
|
Details
|
 |
|
03-18-2007
|
3.00
|
2nd attempt of the Horizontal Stabilizer Rear Spar
|
Details
|
|
|
03-17-2007
|
2.00
|
Finished Horizontal Stabilizer Doublers
|
Details
|
|
|
03-07-2007
|
2.00
|
Outstanding Success with bend brake tuning !
|
Details
|
 |
|
03-06-2007
|
1.00
|
Tuning of the brake
|
Details
|
|
|
03-05-2007
|
2.00
|
2nd attempt at Stabilizer Spar doublers
|
Details
|
|
|
03-05-2007
|
2.00
|
2nd attempt at Stabilizer Spar doublers
|
Details
|
|
|
03-04-2007
|
4.00
|
First attempt at Stabilizer Rear Spar
|
Details
|
|
|
03-03-2007
|
2.00
|
Cutting 0.040" for Horizontal Stabilizer Rear Spar
|
Details
|
|
|
03-03-2007
|
2.00
|
Cutting 0.040" for Horizontal Stabilizer Rear Spar
|
Details
|
|
|
03-03-2007
|
2.00
|
Cutting 0.040" for Horizontal Stabilizer Rear Spar
|
Details
|
|
|
02-26-2007
|
0.00
|
Finally picked up aluminum order from Trident
|
Details
|
|
|
02-25-2007
|
3.00
|
Upper Elevator Horn
|
Details
|
|
|
02-24-2007
|
4.00
|
Completed Rudder Ribs
|
Details
|
|
|
02-23-2007
|
1.50
|
Elevator Ribs
|
Details
|
|
|
02-22-2007
|
2.00
|
Finished Horizontal Stabilizer Ribs
|
Details
|
 |
|
02-18-2007
|
3.00
|
Horizontal stabilizer ribs
|
Details
|
|
|
02-18-2007
|
1.00
|
Horizontal Stabilizer end tips
|
Details
|
 |
|
02-17-2007
|
3.00
|
Formed first part !
|
Details
|
|
|
02-13-2007
|
0.00
|
Ordered Aluminum... again !
|
Details
|
  |
|
02-11-2007
|
2.00
|
Cutting blocks for horizontal stabilizer ribs
|
Details
|
|
|
02-10-2007
|
2.00
|
Forming block for horizontal stabilizer ribs
|
Details
|
|
|
02-09-2007
|
2.00
|
Finished 10' Bend Brake
|
Details
|
|
|
02-09-2007
|
0.00
|
Cancelled Order from Aircraft Spruce !!!
|
Details
|
  |
|
02-08-2007
|
0.00
|
Ordered Aluminum
|
Details
|
|
|
02-04-2007
|
5.00
|
Building 10' Bend Brake
|
Details
|
|
|
01-31-2007
|
0.00
|
Materials for 10' Bend Brake
|
Details
|
|
|
01-29-2007
|
0.00
|
Plans arrive
|
Details
|
|
|
01-28-2007
|
2.00
|
Built router table
|
Details
|
|
|
01-21-2007
|
5.00
|
Moved Table and Tools Back to the garage
|
Details
|
|
|
01-20-2007
|
1.00
|
Visited Harbor Freight Tools
|
Details
|
|
|
01-16-2007
|
0.05
|
Ordered Plans and Hardware box for 601XL
|
Details
|
  |
|
01-07-2007
|
0.00
|
Visiting Dave Clay (continued)
|
Details
|
|
|
01-07-2007
|
3.00
|
Visited Fellow Scratch Builder Dave Clay
|
Details
|
|
|
01-06-2007
|
1.00
|
Visited Harbor Freight
|
Details
|
 |
|
01-01-2007
|
8.00
|
Clean up !
|
Details
|
|
|
12-31-2006
|
2.00
|
Preparing Work Area
|
Details
|
|
|
12-30-2006
|
0.50
|
Installed KitLogPro
|
Details
|
 |