KitLog pro

Powered By Kitlog Pro v2.0

N115AR 601XL - FOR SALE
' style=
Date:  4-18-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  1.- Installing the L angle under first tube frame

This is a little item that can be easily missed on the drawings. That is the L angle that connects the rear upright channel with the first tube frame. I decided to fabricate a wider/stronger "L" angle out of .032 material. I also installed it facing forward since it provides a larger contact surface so as to install 2 rivets.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.