Powered By Kitlog Pro v2.0
BushCaddy ELSA
Bushcaddy E-LSA
All
301 Logs Found
Date
Hours
Work Log Summary
Details
06-05-2011
0.0
Testing the air cooling
Details
03-27-2010
3.5
Installation of MC BRKT
Details
09-09-2009
1.0
Checked wheels bearings
Details
09-02-2009
0.0
Bushcaddy Flight test Manual
Details
09-01-2009
0.0
Bushcaddy Flight test
Details
08-24-2009
1.5
DAR visit
Details
08-23-2009
0.0
Monday is the day
Details
08-01-2009
2.0
Closer
Details
07-26-2009
3.0
Completing the preflight checks of all hardware
Details
07-21-2009
2.0
Moved Carb Heat cable
Details
07-18-2009
0.0
More pictures
07-18-2009
6.0
Finished the wing gap seals
Details
07-17-2009
2.0
Raise fuel lines
Details
07-05-2009
7.0
Worked on right wing gap seal
Details
07-02-2009
2.0
Wing Gap Seal
Details
06-27-2009
5.0
Added 10 gal of 100 LL to fuel tanks.
Details
06-26-2009
3.0
Installed jury struts
Details
06-17-2009
1.5
Elevator deflections
Details
06-16-2009
2.0
Fuel Guages
Details
06-15-2009
1.0
Aileron limits
Details
06-13-2009
10.0
Aileron control and prop
Details
06-12-2009
5.0
Fuel drain valves
Details
06-06-2009
2.0
Put wings on
Details
05-31-2009
4.0
Navigation light wiring and wing tip on left wing
Details
05-30-2009
8.0
Finishing the little things
Details
05-25-2009
1.5
Paint the struts
Details
05-23-2009
1.0
Primed the struts
Details
05-20-2009
1.5
Fuel system
Details
05-19-2009
2.5
Matco brakes and tail wheel springs
Details
05-17-2009
2.5
N620MP move to Hanger
Details
05-16-2009
4.0
Ram ducts bleed air to the coils
Details
05-10-2009
2.0
PTT
Details
05-09-2009
5.0
F/W insulation, Parking brake valve
Details
05-03-2009
6.0
Parking Brake, Seat blets navigation lights wiring
Details
04-22-2009
1.0
New attachment on left side
Details
04-18-2009
5.0
Finishing up some wiring connections
Details
04-09-2009
1.5
Securing wiring FWF and parking brake valve
Details
04-07-2009
0.0
Use this web site to order your Electrical supplie
Details
04-05-2009
3.0
Odds and Ends
Details
04-03-2009
2.0
Brakes and 12 volt outlet
Details
04-02-2009
3.0
EIS trouble shooting and starter solenoid wiring
Details
04-01-2009
4.0
Continued wiring of panel
Details
03-31-2009
4.0
Wiring
Details
03-08-2009
2.5
Engine throttle cable
Details
02-04-2009
2.0
Magnetometer Installation
Details
02-01-2009
3.0
Wired Magnetos to switch
Details
01-24-2009
4.0
Continued working on wiring and fuel system
Details
01-22-2009
1.0
Wiring
Details
01-20-2009
1.5
Wired CHT's
Details
01-18-2009
3.0
Re setting the rudder cables
Details
01-14-2009
1.0
Wings to the hanger
Details
01-04-2009
6.0
Wiring the panel and FWF
Details
12-13-2008
3.0
Worked on elecrical plan
Details
11-22-2008
4.0
Wnishield install
Details
11-15-2008
3.0
Bolting on all the parts
Details
11-11-2008
1.0
Panel
Details
10-21-2008
2.0
CHT probes and throtlte cable install
Details
10-04-2008
1.0
Avionics
Details
09-20-2008
4.0
worked on horizontal, rudder, panel and avionics
Details
09-14-2008
2.5
The last of the parts to be painted right now.
Details
09-13-2008
2.5
White Eco-Primer and filler
Details
09-12-2008
2.0
Eco-Fill on fiberglass part
Details
09-07-2008
4.0
Painting
Details
09-06-2008
3.5
To day was a Santa Fe Burgundy Day
Details
09-06-2008
0.5
Moved the air box
Details
09-04-2008
1.5
Fix the little mistakes from last night painting
Details
09-03-2008
4.0
Yellow top coat on fuselage
Details
09-02-2008
1.5
Fuselage primed
Details
09-01-2008
6.0
Pre-pared fuselage for priming
Details
08-31-2008
2.0
Left wing top coat
Details
08-30-2008
3.5
Left wing prime
Details
08-16-2008
4.5
Repaint of small parts
Details
08-15-2008
4.5
Learning curve
Details
08-14-2008
3.0
Well this is why we build
Details
08-13-2008
5.0
One wing primed
Details
08-12-2008
5.0
Primer on
Details
08-12-2008
3.0
More pictures
Details
08-11-2008
3.0
Paint both
Details
08-10-2008
4.0
Paint Boot set up
Details
08-07-2008
1.5
Cut out openings in panel
Details
08-06-2008
2.0
Setting paint booth
Details
07-28-2008
3.0
Installed aft left side fuel line.
Details
07-21-2008
1.5
Cowling oil door and side doors
Details
07-20-2008
3.0
Fuel system
Details
07-14-2008
1.0
Jim from Jabiru Pacific vist
Details
07-06-2008
3.0
NACA intake scoops and top cowling
Details
06-28-2008
3.5
Cowling top and engine hatches.
Details
06-22-2008
3.0
Laid up my first fiber glass part and finished the
Details
06-21-2008
2.0
Cowling screws and oil cooler mold
Details
06-16-2008
1.0
Cut out exhaust opening
Details
06-13-2008
3.5
Nut plates
Details
06-12-2008
1.0
Cowling
Details
06-11-2008
1.5
Fit up top opening cowls
Details
05-31-2008
4.0
Lower Cowling
Details
05-29-2008
2.0
pattern for cowling
Details
05-24-2008
3.0
Started stabilizing the Nosebowl
Details
05-17-2008
1.0
Oil Cooler
Details
05-17-2008
3.5
Instaled ram air ducts
Details
05-10-2008
3.0
Worked on Cowling and oil coler
Details
05-07-2008
1.5
Mounted air cowlinf for engine
Details
05-03-2008
3.0
Installed Second Engine Mount
Details
03-22-2008
6.5
Set the wings to the fuselage
Details
03-22-2008
0.0
More instructions on setting wings
Details
03-22-2008
0.0
More instruction on setting the wings
Details
02-08-2008
2.0
Worked on interior and Rudder limit.
Details
02-02-2008
3.0
Electrical Drawing
Details
01-15-2008
1.0
Worked on interior coverings
Details
01-13-2008
2.5
Cargo deck covering
Details
01-10-2008
1.0
Aileron pully
Details
01-05-2008
3.5
Installed fire wall components
Details
01-03-2008
2.0
Checked the engine to thrust line.
Details
12-18-2007
1.0
Heat Muff
Details
12-15-2007
1.0
Heat muff
Details
12-15-2007
3.5
FWF and engine
Details
12-08-2007
2.0
Worked on FWF parts
Details
12-06-2007
1.5
Mounted engine to engine mount then to FW
Details
11-28-2007
1.0
Installed engine mount for fwf setup
Details
11-02-2007
1.0
Shock Cords
Details
10-29-2007
1.0
Static ports
Details
10-22-2007
0.5
The engine has arived.
Details
10-22-2007
0.5
Riveted Vertical stabilizer leading edge.
Details
10-06-2007
2.0
Set winsheild in place and drilled flashing for ri
Details
09-30-2007
0.5
Cable Guide
Details
09-25-2007
0.5
Nut plates for access pannel on left side of verti
Details
09-23-2007
1.0
Trim Control
Details
09-16-2007
3.0
Finished Left aileron
Details
09-15-2007
2.0
Left Aieron skin
Details
09-09-2007
1.0
Right side of fuselage
Details
09-08-2007
2.0
Started left Aileron
Details
09-06-2007
1.0
Tail strobe
Details
09-06-2007
0.0
Pictures
09-04-2007
1.0
Elevator deflection set
Details
09-03-2007
3.0
Worked on Aileron cable and pulleys
Details
09-03-2007
2.0
Elevator spring conections
Details
09-02-2007
1.0
Aileron cables
Details
09-01-2007
0.0
Picturs
09-01-2007
3.0
More work on controls
Details
08-29-2007
1.0
Rudder cables
Details
08-28-2007
1.0
Control rod cover
Details
08-27-2007
1.0
Part 297
Details
08-24-2007
1.0
Bead blasted main landing gear
Details
08-23-2007
1.0
Rudder cables
Details
08-21-2007
0.0
Tip #3
Details
08-21-2007
2.0
Control rod ends
Details
08-18-2007
3.0
Started installing controls
Details
08-16-2007
4.0
Skin second elevator
Details
08-06-2007
2.0
Aileron bellcrank cover and wing tip
Details
08-05-2007
6.0
Trailing edge and nose skin
Details
08-03-2007
1.0
Riveted K-331
Details
08-02-2007
0.5
K-331 deburred
Details
08-01-2007
1.0
Worked on K-331
Details
07-30-2007
2.5
Left wing bottom skin and Pitot tube
Details
07-28-2007
2.0
Leading edge ribs and bottom skin
Details
07-27-2007
1.0
Finished Installing RLI Pitot
Details
07-26-2007
1.5
Worked on installing the Reserve Lift Indicator Pi
Details
07-25-2007
1.5
Worked on left inspection cover for airleron
Details
07-24-2007
2.8
left wing ribs and stringers
Details
07-23-2007
0.8
Left wing bottom skin
Details
07-22-2007
1.5
Left wing bottom skin
Details
07-21-2007
4.5
Left wing bottom skin
Details
07-20-2007
5.0
Left wing top skin
Details
07-19-2007
2.5
Top skin on left wing
Details
07-17-2007
2.5
Left wing top skin
Details
07-16-2007
2.0
Left wing
Details
07-15-2007
1.0
Squared and clecoed rib, spares, nose ribs and tra
Details
07-07-2007
0.5
Glare shield solid rivets completed
Details
07-05-2007
1.0
Completed left side door
Details
07-01-2007
1.0
Mounted the left door
Details
06-30-2007
4.0
Left wing ribs
Details
06-29-2007
1.0
Left wing ribs
Details
06-27-2007
1.0
Worked on ribs 7 - 10
Details
06-26-2007
2.0
Started rib for left wing
Details
06-25-2007
2.5
Left wing ribs
Details
06-21-2007
3.0
Right Aileron
Details
06-20-2007
2.0
Worked on skin of Right aileron
Details
06-19-2007
1.0
Aileron skin
Details
06-18-2007
3.0
Drilled and clecoed left Aileron
Details
06-17-2007
2.5
Started the Ailerons
Details
06-14-2007
2.5
Fininshed the wing tonight
Details
06-13-2007
1.5
Finished trailing edge skin
Details
06-11-2007
2.0
Riveted leading edge of right wing
Details
06-10-2007
2.0
Right Wing nose skin
Details
06-09-2007
5.0
Right wing nose skin
Details
06-08-2007
7.5
Rivet bottom skin
Details
06-07-2007
4.5
Bottom Skin
Details
06-05-2007
2.5
Bottom skin
Details
06-04-2007
4.0
Right wing bottom skin
Details
06-03-2007
0.0
Pictures
06-03-2007
4.0
Bottom of right wing
Details
06-02-2007
6.0
Finished deburring ribs and frames
Details
05-29-2007
0.5
Top Skin
Details
05-28-2007
2.0
Top skin
Details
05-25-2007
2.5
Rib to skin rivet line
Details
05-24-2007
4.5
Top skin
Details
05-23-2007
1.5
Worked on U stringers to RIbs
Details
05-22-2007
1.5
U stringers
Details
05-21-2007
2.5
Primed U stringers
Details
05-19-2007
1.0
Right wing ribs
Details
05-19-2007
5.5
Right Wing
Details
05-18-2007
3.5
RIb on right wing
Details
05-17-2007
1.5
Laid out right wing spars and squared.
Details
05-16-2007
3.0
Primed and Riveted left wing spars
Details
05-15-2007
4.0
Left wing spars
Details
05-14-2007
2.5
Riveting right wing spars
Details
05-13-2007
1.0
Primed the Right wing spars
Details
05-10-2007
1.0
Finished setup on right front wing spar
Details
05-09-2007
2.5
Right wing
Details
05-07-2007
3.0
Started the Right wing
Details
05-06-2007
3.0
Installed rudder pedals
Details
05-05-2007
6.0
Installed landing gear
Details
05-04-2007
1.0
Finished the right seat rail
Details
05-03-2007
1.5
Completed right seat frame
Details
05-02-2007
1.0
worked on vertical stbilizer strobe
Details
05-01-2007
1.5
worked on left seat frame
Details
04-29-2007
2.0
Completed Left seat frame
Details
04-26-2007
1.0
Seat frame
Details
04-25-2007
1.0
Started seat construction
Details
04-24-2007
1.0
Right Elevator
Details
04-24-2007
2.0
Left door
Details
04-21-2007
6.0
Worked on elevator
Details
04-21-2007
1.0
Change the door skin
Details
04-19-2007
0.5
Installed door handle on right door
Details
04-19-2007
2.0
Cleaned and primed second elevator parts
Details
04-19-2007
0.0
Bolt Torque
Details
04-18-2007
1.5
Mounted rudder on vertical stabilizer
Details
04-17-2007
1.0
Installed lift strut on right door
Details
04-16-2007
0.5
Worked on the Left door PH-234
Details
04-14-2007
2.5
Worked on right door
Details
04-14-2007
0.0
More door pictures
04-14-2007
1.5
finished attaching landing gear brackets
Details
04-14-2007
1.5
Drilled holes in glare shield
Details
04-13-2007
1.5
Started spraying out cargo area
Details
04-12-2007
1.5
Installed PG-228
Details
04-09-2007
0.5
Cleaning up loose ends
Details
04-07-2007
4.0
Worked on cabin fuselage top
Details
04-07-2007
0.0
Total picture
04-06-2007
7.0
Worked on cabin to fuselage skin and primed roof p
Details
04-04-2007
0.0
More pictures
Details
04-04-2007
0.0
More cargo door pictures
Details
04-04-2007
2.5
Completed cargo door installation
Details
04-03-2007
2.0
Smoothed out edges of cargo door
Details
04-02-2007
4.0
Curt out for cargo door
Details
04-01-2007
3.0
Attaching cabin to fuselage and side skins
Details
03-28-2007
0.5
Vist by A&P
Details
03-27-2007
4.5
Finished cabin roof
Details
03-26-2007
3.0
Finished the solid rivets on the cabin front skin
Details
03-25-2007
5.0
Workd on cabin skin and glare shield
Details
03-24-2007
7.0
Rudder pedals and front cabin skins
Details
03-23-2007
2.0
Completed landing gear instalation on bottom of ca
Details
03-22-2007
1.5
Landing Gear brackets
Details
03-21-2007
1.0
Continued to work on bottom rivets
Details
03-20-2007
3.0
Continued to work on cabine
Details
03-19-2007
4.3
Worked on bottom skin
Details
03-19-2007
0.0
Use the rivet spacer gauge for drilling perfict ri
Details
03-17-2007
2.0
Worked on cabin top and Primed bottom panels
Details
03-15-2007
2.0
Installed PF-183, PF-184 & PF-185
Details
03-15-2007
0.0
Bending the flang ends on PF-183 & PF183
Details
03-14-2007
1.3
Riveted front left panel on fuselage
Details
03-14-2007
2.0
Cabin top and front
Details
03-12-2007
2.0
Firewall installation
Details
03-10-2007
2.0
Back of cabin
Details
03-09-2007
4.0
Riveted and installed cabin parts primed
Details
03-08-2007
3.5
Cabin brackets
Details
03-07-2007
3.0
Cabin top framing
Details
03-06-2007
4.5
Left cabin side and ASS-001
Details
03-05-2007
2.5
Riveting the cabins right side
Details
03-04-2007
0.5
Primed Left cabin side parts.
Details
03-01-2007
1.5
Left cabin side
Details
02-25-2007
2.5
Started the cabin
Details
02-24-2007
7.0
Bottome Skin work
Details
02-23-2007
4.0
Bottom Skin
Details
02-22-2007
1.5
Left horizontal stabilizer bootm skin
Details
02-22-2007
1.5
Installed bottom stringers
Details
02-21-2007
6.0
Continued working on horizontal stablizer
Details
02-20-2007
3.0
Worked on Left horizontal stabilizer
Details
02-09-2007
6.0
Primed and riveted horizontal stringers in place
Details
02-08-2007
2.0
Worked on horizontal stabilizer
Details
02-07-2007
2.0
Vertical Stabilizer skin on both sides
Details
02-06-2007
0.8
Horizontal Stabilizer alignment
Details
02-06-2007
2.3
Continued fitting up skin on vertical stabilizer
Details
02-04-2007
4.0
PB-46 & 47 on right side.
Details
02-03-2007
8.0
Time for skin
Details
02-02-2007
4.0
Continued on vertical Stabilizer frame.
Details
02-01-2007
2.0
Started the Vertical Stabilizer
Details
01-25-2007
9.0
PD-89 & PD-90
Details
01-24-2007
1.0
Triming B-29 and B-76
Details
01-24-2007
0.5
PB-24
Details
01-21-2007
2.0
PA-022 Riveted
Details
01-20-2007
6.0
Bulkhead 07, PA-012 & PA-013, Skin work
Details
01-19-2007
2.0
Installed PA-014
Details
01-16-2007
2.5
Top Outside corners
Details
01-15-2007
0.0
Tip #2
Details
01-15-2007
3.0
Drilled and clecoed PA-011 on left outside corner
Details
01-13-2007
6.5
Installing A-10 inside corner
Details
01-10-2007
3.5
Lower inside cornners
Details
01-08-2007
2.5
Installing A-015 and A-014 & Priming
Details
01-06-2007
6.0
Alignment of bulheads and top U stringer
Details
01-04-2007
1.5
Attaching rudder cable guid blocks
Details
01-03-2007
2.0
Setting up Bulkheads A-001 & A-006
Details
01-02-2007
0.0
Tip #1
Details
12-29-2006
4.0
Building the rudder at Busscaddy USA
Details
SITE NAVIGATION
Contact Builder
Bushcaddy E-LSA Home
All
Ailerons
Avionics
Cabin
Cabin to Fuselage
Cargo door
Controls
Cowling and nosebowl
Doors & Windshield
E-LSA Kit complete
Elecrtical
electrical wiring
Elevator
Engine
Engine mount
Fire Wall Forward
Fuel System
Fuselage
Horizontal Stabilize
Inspection
Interior Finishing
Landing Gear
Miscellaneous
Painting
Rudder
Seats
Technical Advisers
Tip
Vertical Stabilizer
Wings
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.