KitLog pro

Powered By Kitlog Pro v2.0

BushCaddy ELSA
' style=
Date:  2-9-2007
Number of Hours:  6.00
Manual Reference:  Secton D
Brief Description:  Primed and riveted horizontal stringers in place

Spent early morning priming all the horizontal parts and deburring stringer. Afternoon attached stringers to horizontal stabilizer. Installed all bolts and evevator hinges. Clamped left bottom skin to underside of stabilizer and traced stringers for rivet lay out. removed and set aside will install bottom skins when I turn fuselage over to do the bottom. Installed top PD-85 and drilled de-burred and riveted in place. Clamped top skin on left side over frame work and traced stringers from under side. Laid out rivet line center punched and drilled from back side. clamped back on stabilizer and drilled into stringers and clecoed as I went. Placed leading edge under top skin and drilled through from top skin rivet line after I cut out for PD-75 top and bottom and clecoed in place.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.