KitLog pro

Powered By Kitlog Pro v2.0

BushCaddy ELSA
' style=
Date:  2-2-2007
Number of Hours:  4.00
Manual Reference:  Section B
Brief Description:  Continued on vertical Stabilizer frame.

I lined up and continued checking the marks as I drill and cleco parts in place. Once all has been drilled and marked de-burred all holes and started riveting in place. PB-30 is shown on drawing A-V-S-015 that is when you will rivet PA-015 and PB-30 to bulkhead 7 with a 470-4-6 rivet. The drawing calls for a 470-4-7 rivet but that is to long for the parts. This is where you will find out if you have the right bucking bar in your tools. It’s a very tight fit. Continue checking alignment every time you do something. I am starting to get the hang of the solid rivets. It sure help to spend some time with Rick.
' style=

Keep checking the line up to keep it straight

Keep checking the line up to keep it straight

' style=

Make sure it is all locked in place while you work on it.

Make sure it is all locked in place while you work on it.

' style=

Check and re-check the line up through the building process.

Check and re-check the line up through the building process.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.