KitLog pro

Powered By Kitlog Pro v2.0

Eric Seber - Waiex Project
Work Logs Found: 216
Category Work Time: 460 Hours
 Date
Hours
Work Log Summary

Details

 02-09-2014
3.30
Finished Drilling Gussets to Ribs, Debured, & Inst
Details
       

 02-07-2014
2.80
Preped FWD Wing Ribs & Bent Gussets
Details
     

 01-31-2014
1.50
Rivet Gussets on Aft Wing Ribs -01 thru -04
Details
       

 01-30-2014
1.70
Debur and Prime Aft Rib Gussets
Details
     

 01-29-2014
2.50
Finished Aft Rib Cutouts and Located Gussets
Details
       

 01-27-2014
1.00
Cutting Clearance Notches in Aft Ribs 1-5
Details
     

 01-23-2014
2.00
Bend Aft Rib Gussets
Details
       

 01-20-2014
0.75
Moved Fuselage and Gather Part for Aft Wing Rib Wo
Details
       

 01-19-2014
4.00
Reorganized and Cleaned Shop
Details

 01-18-2014
4.70
Started Assembling Aft Spar Carry-Thru Structure
Details
       

 01-16-2014
2.25
Drilled and Installed Taper Pin in New Mixer Pivot
Details
       

 01-12-2014
3.00
Installed Taper Pins in Control Tree Assembly
Details
       

 01-11-2014
2.00
Prepring & Reaming Control Tree Bushings
Details
       

 01-08-2014
2.50
Assembling Control Sticks and Mixer
Details
       

 01-01-2014
3.00
Installed Brackets for Master Cylinder
Details
       

 12-30-2013
2.00
Fabricated Master Cylinder Attach Brackets
Details
       

 12-29-2013
3.00
Started Installation of Hydraulic (AeroBrake) Kit
Details
       

 12-28-2013
3.50
Installed Flap Drive Tube Assembly
Details
       

 12-22-2013
6.15
Fabricated Stabilator Service Bulletin Parts & Ins
Details
       

 12-21-2013
4.90
Started Pilot Drilling Stabiltor Fittings
Details
       

 12-13-2013
1.50
Fitting Stabilators to Aft Fuselage
Details

 12-09-2013
1.50
Drilled the Axles - And She is On the Ground!
Details
       

 12-08-2013
3.50
Set Toe-In & Built Up Whell Assemblies
Details
       

 11-24-2013
3.75
Started Fitting Main Gear Legs
Details
       

 11-22-2013
4.10
Trimed Shims, Primed Mount Holes, and Installed Mo
Details
       

 11-21-2013
4.50
Finished Fitting and Began Drilling Motor Mount
Details
       

 11-18-2013
1.75
Began Fitting Motor Mount...Finally
Details
       

 10-29-2013
2.00
Continuing on the Glarshield and Panel Fitting
Details
       

 10-22-2013
2.00
Fitting Various Glarshield & Panel Parts
Details
       

 10-20-2013
1.05
Fitting Glareshield
Details
       

 10-16-2013
1.50
Glarshield Parts
Details
       

 10-15-2013
2.85
Drilled New Tail Spring, Installed Tailwheel Assem
Details
       

 10-07-2013
3.50
Installed Lower Fuel Tank Straps & Began Glareshie
Details
       

 10-03-2013
3.00
Final Install of Rudder Pedals & Started Aft Spar
Details
     

 10-01-2013
2.50
Fabrictaed 2nd Rudder Pedal Block and Fitted Pedal
Details
       

 09-30-2013
1.00
Rudder Pedal Support Blocks
Details
     

 09-27-2013
2.00
Drilled Tail Spring Rod
Details
     

 09-24-2013
2.50
Trimed Seat Sling to Fit and Installed Hing Halves
Details
       

 09-23-2013
2.20
Fitted, Drilled and Riveted Hinge Halves to Seat S
Details
       

 09-22-2013
5.00
Continued Layout of Seat Sling and Made Cutouts
Details
       

 09-18-2013
1.75
Seat Sling Layout
Details
     

 09-17-2013
2.00
Fabricated Seat Hinge Halves and Pins
Details
     

 09-16-2013
2.50
Installed Nutplates In Floor Supports for Hat Chan
Details
     

 09-15-2013
0.75
Cut and Drilled Hat Channel
Details
       

 09-05-2013
1.25
Installed Flap Detent Angle and Brackets
Details
     

 09-04-2013
2.15
Fitted and Drilled Flap Angle and Attach Bracktets
Details
     

 09-03-2013
0.75
Reivewed F08 Plans & Started Fabricating Flap Angl
Details
     

 08-27-2013
1.30
Finished Deburring, Cleaning and Priming Seat Part
Details
     

 08-26-2013
2.00
Updrilled Remaining Large Holes and Started Deburr
Details

 08-25-2013
1.20
Continued Updrilling Seat Section Parts
Details
     

 08-24-2013
0.75
Began Updrilling Lower Skin Pilot Holes
Details
     

 08-23-2013
1.75
Pilot Drilled CTR Channels, Gussets, & Idler Assy.
Details
       

 08-22-2013
2.10
Continued Fitting Lower Seat Attach Parts
Details
       

 08-21-2013
1.50
Fitting Seat & Seat Belt Attach Parts
Details
       

 08-20-2013
2.20
Fitted, Drilled, Primed & Assembled Seat Belt Atta
Details
       

 08-19-2013
1.50
Finished Parts for Aft Lower Seat Area - F10
Details
       

 08-18-2013
5.00
Still Making Parts for Aft Lower Section of FWD Fu
Details
       

 08-16-2013
3.60
Continued Making F10 FWD Fuse Lower Parts
Details
       

 08-08-2013
1.00
Made Idler Assembly Spacer Block and Assembled
Details
     

 08-07-2013
2.25
Riveted Lower Firewall Hinges & Drilled Idler Arm
Details
       

 08-06-2013
2.00
Installed Lower FWD Fuselage Skin
Details
     

 08-05-2013
1.00
Priming Lower FWD Fuselage Skin
Details
     

 07-19-2013
1.00
Finished Installing Side Panel Longeron Bolts
Details

 07-18-2013
1.00
Installed Upper Longeron Splice Bolts & Upper Fire
Details
       

 07-17-2013
1.20
Installed Splice Plate Attach Bolts
Details
       

 07-16-2013
1.25
Continued Riveting FWD Fuselage
Details
       

 07-15-2013
2.40
Reassembled and Began Riveting FWD Fuselage
Details
       

 07-14-2013
1.45
Finished Cleaning and Painted LH side Panel
Details
     

 07-13-2013
1.00
Preped LH Side Panel
Details

 07-12-2013
1.20
Cleaned Deburred and Painted RH Side Panel
Details

 07-11-2013
1.75
Finished Countersinking & Deburring Side Panels
Details
       

 07-08-2013
1.00
Deburring & Dimpling FWD Fuse Parts
Details

 07-07-2013
1.00
Dissambled and Deburred
Details
       

 07-06-2013
4.10
Updrilled and Disassembled
Details
       

 07-05-2013
3.00
Fitted and Drilled Stiffeners, Clips and Gussets
Details
       

 07-04-2013
2.00
Fitted and Pilot Drilled Aft Zee Assembly
Details
       

 07-03-2013
2.50
Fitted and Pilot Drilled FWD Zee Tunnel
Details
     

 07-02-2013
2.20
Remade FWD Zee Tunnel
Details
       

 06-30-2013
1.00
Finished Pilot Drilling Lower Skin to Lower Longer
Details

 06-25-2013
2.10
Located & Drilled Lower Firewall, Pilot Drilled Sp
Details
       

 06-24-2013
2.00
Pilot Drilling FWD Fuselage
Details
       

 06-23-2013
2.75
Reconfigured Workshop and Continued Test Fitting F
Details
     

 06-21-2013
1.00
Fitting FWD Fuselage Parts
Details

 06-20-2013
2.50
Finished FWD Z Tunnel & Began Fitting Fuse Side Pa
Details
       

 06-19-2013
2.00
Continued Laying Out and Cutting FWD Z Tunnel
Details

 06-17-2013
2.00
Countersunk Aft Z Angle Parts & Primed
Details
       

 06-15-2013
2.55
Drilled & Dimpled Aft Z Angle
Details
       

 06-14-2013
2.20
Fabricated -08 clips and Fitted Aft Z Angle Parts
Details
     

 06-12-2013
1.00
Gathered Parts for WIX-F16 - Z Angle
Details
     

 06-11-2013
0.50
Made Bends in Lower Firewall
Details
       

 06-10-2013
1.50
Fitted and Pilot Drilled Windshield Strap to Upper
Details
       

 06-09-2013
1.25
Attached Filler Box to Upper Firewall Former
Details
       

 06-08-2013
1.50
Bent Main Filler Box, Drilled and Riveted Assembly
Details
       

 06-07-2013
1.25
Bent Firewall Filler Box
Details
       

 05-30-2013
1.10
Finished F17 Clips, Began Marking Bends for Filler
Details
       

 05-29-2013
1.00
Continued Making Gusset Plates
Details

 05-28-2013
1.00
Started Fabricating Firewall Assembly Parts
Details
       

 05-27-2013
1.50
Organized & Gathered Parts for Firewall
Details

 05-21-2013
1.75
Cleaned and Primed LH Fuse. Panel Parts
Details
     

 05-20-2013
1.00
Disassembled and Deburred LH Panel Parts
Details
       

 05-19-2013
2.75
Finished Pilot Drilling LH Panel Parts & Updrilled
Details

 05-18-2013
1.50
Continued Pilot Drilling LH Panel Parts
Details
       

 05-12-2013
0.75
Continued Pilot Drilling LH Panel Parts to Skin
Details

 05-11-2013
1.75
Started Pilot Drilling LH Side Panel
Details
     

 05-09-2013
1.25
Installed Bolts in RH Panel
Details
       

 05-08-2013
1.50
Riveted RH Side Panel
Details
       

 05-07-2013
0.90
Clecoed RH Side Panel - Ready for Riveting
Details
     

 05-06-2013
2.00
Deburred, Cleaned & Primed RH Side Panel Parts
Details
       

 05-05-2013
3.50
Updrilled, Disassembled and Began Deburring RH Sid
Details
       

 05-04-2013
2.00
Fitted and Drilled Gussets and Gear Support Struct
Details
       

 05-02-2013
1.50
Continued RH Side Panel Buildup
Details
       

 05-01-2013
1.50
Continued Pilot Drilling RH Side Panel Parts
Details
       

 04-30-2013
2.00
Began Pilot Drilling RH FWD Fuselage Side Panel
Details
       

 04-29-2013
1.00
Organized Parts for FWD Side Panel Buildup
Details

 04-28-2013
3.00
Fabricated Upper Longeron Assemblies
Details
       

 04-18-2013
1.25
Fabricated Cowling Attach Hinge and Firewall Angle
Details
       

 04-17-2013
1.00
Continuing Misc FWD Fuselage Parts
Details
     

 04-16-2013
2.00
Fabricating Misc Fwd Fuselage Parts
Details

 04-15-2013
1.50
Fabricated -06 Angle Clips
Details
     

 04-01-2013
1.70
Finished Flap Drive Tube Support
Details
     

 03-31-2013
2.00
Making Parts For The FWD Side Walls
Details
       

 03-30-2013
3.00
Installed Upper FWD Longeron Bolts & Riveted Cross
Details
       

 03-29-2013
3.00
Riveted Remaining Formers & Turtle Deck Skin
Details
       

 03-28-2013
2.75
Reassembled and Began Riveting Turtle Deck
Details
       

 03-27-2013
2.00
Primed Turtle Deck Parts & Mating Surfaces
Details
       

 03-26-2013
1.00
Continued Deburring & Tweaking Parts
Details

 03-25-2013
1.00
Deburring Turtle Deck Parts
Details
       

 03-24-2013
4.80
Fitted and Drilled #2 & 3 Formers and Updrilled Tu
Details
       

 03-23-2013
2.20
Fitted LH & RH Attach Plates & Splice Plate
Details
       

 03-22-2013
0.80
Fitted & Pilot Drilled LH & RH #1 Formers
Details
       

 03-21-2013
2.10
Pilot Drilled Turtle Deck Skin & Fitted #5 Former
Details
       

 03-20-2013
2.00
Riveted Turtle Deck Spline
Details
       

 03-19-2013
1.80
Fitting & Drilling Turtle Deck Skin at Spline
Details
       

 03-19-2013
0.50
Discovered Incorrect Cut Out Placement on Turtle D
Details
       

 03-18-2013
1.20
Fitted,Drilled, & Primed Turtle Deck Spline
Details
       

 03-17-2013
3.50
Fabricating Turtle Deck Parts
Details
       

 03-16-2013
2.35
Started Gathering Parts for Turtle Deck Installati
Details
       

 03-16-2013
0.75
Installed FWD Cross Tie Box Bolts
Details
     

 03-15-2013
2.35
Finished Riveting Aft Lower Fuselage
Details
     

 03-14-2013
1.80
Installing Rivets & Bolts in Tail Section of Aft F
Details
       

 03-13-2013
1.90
Reassembling, Dimpling, & Riveting Aft Fuselage
Details
       

 03-12-2013
2.00
Cleaned, Preped, & Primed Aft Fuselage Parts
Details
       

 03-11-2013
2.25
Finished Deburring Aft Fuselage and Parts
Details
       

 03-10-2013
3.20
Finished Updrilling, Started Disassembly, & Deburr
Details
     

 02-28-2013
1.50
Up Drilled Aft Fuselage Components
Details

 02-28-2013
2.00
Continued Updrilling Aft Fuselage Components
Details

 02-27-2013
1.90
Finished Fitting & Pilot Drilling Aft Fuselage
Details
       

 02-26-2013
1.50
Fitted & Drilled Aft Mount Assemblies & Aft Shear
Details
       

 02-25-2013
2.00
Fitting & Drilliing "Y"Tail Structure
Details
       

 02-24-2013
3.00
Fitted & Drilled Lower Cross Ties, Mixer Sturcture
Details
       

 02-23-2013
3.00
Fitting & Drilling Lower Skin
Details
       

 02-22-2013
0.00
New Right Angle Drill Arrived Today!
Details
     

 02-15-2013
2.50
Fitting Aft Fuselage Components
Details
       

 02-13-2013
1.90
Started Test Fitting Aft Fuselage Panels and Parts
Details
       

 02-12-2013
2.00
Assembled "Y" Tail Structure
Details
       

 02-11-2013
2.10
Updrilled, Deburred, Cleaned & Primed "Y" Tail Str
Details
       

 02-10-2013
1.50
Fitted & Drilled Remaining "Y" Tail Components
Details

 02-04-2013
1.75
BeganDrilling "Y" Tail Structure
Details
     

 02-03-2013
3.75
Cutting, Laying Out & Drilling Channel
Details
       

 02-02-2013
2.00
Make Aft Shear Web & Review Plans F22
Details
     

 01-30-2013
2.20
Assembled LH & RH Mount Assemblies
Details
     

 01-29-2013
1.50
Bending F23 Parts & Fitting RH Mount Assembly
Details
     

 01-28-2013
1.20
Installed 3L Vertical Channel & Bent "Y" Tail Moun
Details
       

 01-27-2013
4.25
Finished Cross Ties & Began Tail Mount Plans Sheet
Details
       

 01-26-2013
3.00
Riveted Cross Tie Box and Fabricated Cross Ties
Details
       

 01-25-2013
1.50
Fitted and Drilled Cross Tie Box
Details
       

 01-22-2013
2.50
Riveted Aft Fuselage Mixer Mount Assemblies
Details
       

 01-21-2013
1.20
Fitted & Updilled Remaining Mixer Mount Parts
Details
       

 01-20-2013
3.50
Cut, Drill & Layout Mixer Structure
Details
     

 01-19-2013
2.50
Studied Plans & Began making F25 Mixer Structure P
Details
     

 01-18-2013
1.00
Riveted LH Aft Fuselage
Details
     

 01-14-2013
1.00
Primed LH Aft Fuselage Parts
Details
       

 01-13-2013
4.00
Updrilled LH Aft Fusleage Structure, Deburred and
Details
       

 01-12-2013
2.90
Positioned & Pilot Drilled Aft Fuselage Structure
Details

 01-09-2013
2.00
Finished Priming & Riveted RT Aft Fuselage Structu
Details
       

 01-08-2013
3.00
Finished Deburring & Prepped for Prime
Details
     

 01-06-2013
7.00
Fitted and Drilled Rt Aft Fuselage Skin
Details
       

 01-04-2013
2.00
Bent FWD Edge of AFT Fuselage Skins
Details
       

 01-01-2013
6.20
Made F27 Parts & Layed Out Fuselage Skin Holes
Details
       

 12-30-2012
3.25
Finished Aft Verticals & Cut F27 Longerons
Details
     

 12-28-2012
2.00
Asembled New Band Saw
Details
     

 12-27-2012
3.00
Fabricated Aft Z Channel & #5 Verticals
Details

 12-26-2012
0.70
Finished Making Aft Vertical Channels
Details

 12-23-2012
2.00
Continued Making Aft Vertical Channels
Details

 12-21-2012
2.00
Installed New Plans Table
Details
       

 12-21-2012
1.90
Cut Aft Fusleage Verticals
Details
     

 12-19-2012
2.20
Primed & Assembled Pulleys & Drilled/Assembled Fai
Details
     

 12-18-2012
1.20
Studied Plans, Gathered Parts, Assembled Pulley Br
Details
     

 12-18-2012
1.00
Minor Finish Work On Stabilators & Test Fitting
Details
       

 12-17-2012
2.20
Piloted, Updrilled and Riveted Lower LH Stab Skin
Details
     

 12-16-2012
8.00
Riveted LH Stabilator Structure & Drilled Top Skin
Details

 12-13-2012
1.00
Deburred and Primed LT Stab Front Spar Buildup
Details

 12-09-2012
7.50
Finished Riveting RT Stabilator, Cut Drilled Stab
Details
       

 12-06-2012
1.50
Riveted Rt Stab Structure, Drilled Upper Stab Skin
Details
       

 12-05-2012
2.15
Cleaned & Preped RT Stab Structure for Prime
Details

 11-28-2012
2.25
Clamped RT Stab Frame, Squared, and Drilled Pilot
Details
       

 11-27-2012
1.25
Drilled Inboard Leading Edge Rib and primed FWD Sp
Details

 11-26-2012
1.75
Drilled and Deburred Rt FWD Stabilator Spar
Details
       

 11-04-2012
2.00
Finished Stabilator Parts
Details

 10-25-2012
1.00
Continuing with Stabilator Ribs
Details

 10-22-2012
2.00
Riveted Rudder & Started Stabilator Ribs
Details

 10-19-2012
2.50
Rivet Layout, Drilling & Deburring of Rudder Assy.
Details
     

 10-16-2012
1.50
Cut Rudder Control Suface to Size
Details

 10-15-2012
2.00
Cut Stabilator Ribs & Spars
Details
     

 10-14-2012
4.00
Organized Hardware Kits
Details
       

 10-11-2012
1.50
Fitted and Drilled Rudder Drive Horn Brackets
Details
     

 10-04-2012
1.00
Organizing & Ordering Hardware Kits
Details

 10-04-2012
1.50
Fabricated First Part & Gathered Components for Ru
Details
     

 10-02-2012
0.50
Started Reviewing the Plans
Details
     

 10-02-2012
3.00
Kit Arrived
Details
       

 10-02-2012
1.50
Completed Bending Brake
Details
     

 09-30-2012
1.00
Assembled New Drill Press
Details
     

 09-24-2012
0.00
Purchasing the Kit
Details

 09-23-2012
4.00
Fabricated Bending Brake Parts
Details
       

 09-17-2012
0.10
Background
Details
       

 09-16-2012
4.00
Air Compressor & Vise Installation
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.