KitLog pro

Powered By Kitlog Pro v2.0

Eric Seber - Waiex Project
' style=
Date:  12-9-2012
Number of Hours:  7.50
Manual Reference:  WIX-T-10, T09, T08
Brief Description:  Finished Riveting RT Stabilator, Cut Drilled Stab

I made significant progress today with installing all of the rivets possible on the RT Stabilator before installing it on the fuselage. The top of the stab rivets mostly have to wait until it is fitted to the fusealge becasue of deburring and rivet access issues, per plans. I also trimmed the fiberglass stab tips and installed the tip ribs. I will be abel to install the tips on the stabs after the ruddervators are fitted. Finally, I started drilling the LT Stab front spar. All in all it was a productive weekend day.
' style=

RT Stab Riveted & Hinge Cut

RT Stab Riveted & Hinge Cut

' style=

Stab Tips Cut and Drilled

Stab Tips Cut and Drilled

' style=

LT Stab Front Spar Drilled

LT Stab Front Spar Drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.