Powered By Kitlog Pro v2.0
Air Camper Construction Log
Air Camper
Engine
36 Logs Found
Date
Hours
Work Log Summary
Details
03-08-2012
30.0
Corvair College #22
Details
04-29-2011
1.0
Shipped Engine to Roy Szarafinski
Details
03-20-2011
1.0
Preparing Engine for Shipping
Details
03-20-2011
1.0
Preparing Engine for Shipping
Details
02-23-2011
2.0
Preparing Engine for Shipping
Details
02-19-2011
1.0
Preparing Engine for Shipping
Details
05-20-2010
1.0
Received Heads from Falcon
Details
12-12-2009
0.5
Recieved Crankshaft from Moldex
Details
10-31-2009
1.5
Welded Engine Jig
Details
10-31-2009
1.5
Cut Material for Engine Jig
Details
10-30-2009
0.5
Shipped Crankshaft to Moldex
Details
10-25-2009
1.0
Engine Front Cover
Details
10-24-2009
1.5
Engine Front Cover
Details
10-19-2009
0.0
Marvel Schebler Carburetor
Details
10-04-2009
1.0
Corvair Engine Parts
Details
09-14-2009
0.1
Crankshaft Update
Details
09-02-2009
0.5
Shipped Crankshaft
Details
08-26-2009
2.0
Packaged Crankshaft
Details
07-22-2009
1.0
Took Heads to Falcon
Details
07-16-2009
0.0
Corvair Cylinder
Details
07-11-2009
0.5
Painted Valve Covers and Baffles
Details
07-11-2009
1.0
Painted Exhaust Logs and Pushrod Tubes
Details
07-10-2009
0.5
Sand Blasted Exhaust Logs
Details
07-10-2009
1.0
Engine Cleaning (phase 1)
Details
07-09-2009
1.0
Exhaust Logs
Details
07-08-2009
1.0
Magnaflux Crank Shaft
Details
07-06-2009
0.5
Engine Cylinder Replacement
Details
07-05-2009
0.5
Engine Overhaul
Details
07-03-2009
2.5
Engine Overhaul
Details
06-24-2009
2.0
Engine Overhaul
Details
06-23-2009
1.5
Engine Overhaul
Details
06-21-2009
4.0
Engine Ovehaul
Details
06-20-2009
5.0
Corvair Engine Removal
Details
06-19-2009
2.0
Corvair Purchase and Delivery
Details
06-18-2009
0.5
Engine Search
Details
06-12-2009
1.0
Engine Search
Details
SITE NAVIGATION
Contact Builder
Air Camper Home
All
Empennage
Engine
Fuselage
Instruments
Landing Gear
Metal Fabrication
Miscellaneous
Shop Prep
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.