KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  3-25-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Landing Gear Tubes

I took a few more minutes to study Bill’s drawing, then using Pythagorean’s theorem I was able to determine the length of the down tubes for each set. So, I went ahead and cut some tubing to length… leaving each piece several inches longer than necessary to provide for proper fitment.
' style=

Landing Gear Main Tubes

Landing Gear Main Tubes

' style=










Copyright © 2001-2019 Matronics. All Rights Reserved.