This log entry accounts for time spent during the previous weeks working on the fuselage sides.
I was able to cut and shape all the diagonal braces for the fuse sides and glue the gussets directly on top of rht framework for the first assembly (left side), but I had to assemble the right side with T-88 only, and then remove the assembly from the jig in order to install the gussets. Although a little time consuming, it came out fine and the two sides were nearly identical.