Powered By Kitlog Pro v2.0
Air Camper Construction Log
Air Camper
Metal Fabrication
48 Logs Found
Date
Hours
Work Log Summary
Details
04-30-2013
1.0
Fuselage Fittings
Details
04-28-2013
2.0
Fuselage Fittings
Details
04-27-2013
2.5
Fuselage Fittings
Details
04-26-2013
2.0
Landing Gear Components
Details
04-12-2013
1.0
Brake Disc Spacer Fitting
Details
04-10-2013
2.5
Fabricating Metal Components
Details
04-10-2013
2.0
Brake Disc Spacers
Details
04-09-2013
1.5
Brake Disc Spacers
Details
04-07-2013
4.0
Fabricated Fuselage Fittings
Details
03-31-2013
3.0
Landing Gear/Lift Strut Attach Fittings
Details
03-29-2013
2.0
Landing Gear/Lift Strut Attach Fittings
Details
11-02-2012
1.0
Paint Metal Parts
Details
11-01-2012
6.0
Blasted and Primed Metal Parts
Details
10-29-2012
1.0
Rudder Pedals
Details
10-28-2012
2.5
Rudder Pedals
Details
10-28-2012
1.0
Painted Metal Parts
Details
10-24-2012
0.5
Landing Gear Strap template
Details
10-20-2012
3.5
Bead Blast and Primer Metal
Details
10-19-2012
2.0
Prepare Metal for Paint
Details
10-16-2012
1.0
Tail Wheel Bushing
Details
10-13-2012
2.0
Rudder Bar Support
Details
10-12-2012
2.0
Tubing Notching
Details
10-09-2012
2.0
Landing Gear Tubes
Details
09-29-2012
2.5
Tail Wheel Mount Fittings
Details
09-23-2012
3.0
Elevator Bellcrank
Details
09-23-2012
1.0
Adjustable so-and-so
Details
09-22-2012
2.0
Rudder Bar
Details
09-16-2012
2.0
Rudder Post
Details
09-12-2012
2.0
Elevator Bellcrank
Details
08-27-2012
2.0
Control System
Details
08-26-2012
3.5
Control System
Details
08-25-2012
3.0
Aileron Control Horn
Details
08-24-2012
3.0
Control System
Details
05-29-2012
2.0
Control System
Details
08-11-2011
2.0
Center Section / Cabane Fittings
Details
06-11-2011
10.0
Center Section / Cabane Fittings
Details
05-30-2011
7.0
Aileron Control Pulleys
Details
05-14-2011
10.0
Control Horns
Details
05-07-2011
5.0
Empennage Fittings
Details
04-02-2011
4.0
Control Horns
Details
01-13-2010
6.0
Drill and Polish Control Horns
Details
01-12-2010
1.5
Control Horn Shaping
Details
01-11-2010
2.0
Cut Control Horns
Details
01-08-2010
1.0
Control Horn Layout
Details
01-07-2010
2.0
Control Horn Templates
Details
09-06-2009
0.5
Fastener Prep
Details
08-23-2009
1.0
Metal Parts Delivered
Details
03-13-2009
4.0
Drawings
Details
SITE NAVIGATION
Contact Builder
Air Camper Home
All
Empennage
Engine
Fuselage
Instruments
Landing Gear
Metal Fabrication
Miscellaneous
Shop Prep
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.