KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  10-20-2012
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Bead Blast and Primer Metal

This morning after pancakes I went over to Larry Trusty's in order to use his bead blaster on some of my metla parts. Once they were all cleraned up I shot them with Zinc Phosphate primer. I wanted to get these done befoer the cold temps set in. May not get around to painting, but at least the parts are preped and primed... I can paint later.
' style=

Zinc Phosphate Primer

Zinc Phosphate Primer

' style=

Control Assemblies

Control Assemblies

' style=

Various Small Fittings

Various Small Fittings

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.