KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  3-23-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Installed Leading Edge and Spar Wedges

Installed leading edge and capped bolt holes with 3/8" dowel. I will trim and sand the dowel after the epoxy cures. I also glued the spar wedge spacers in place.
' style=

Right Wing Leading Edge Installed

Right Wing Leading Edge Installed

' style=

Right Wing Leading Edge Installed

Right Wing Leading Edge Installed

' style=

Spar Wedge

Spar Wedge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.