KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  3-14-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Paint Coat

Applied first coat of paint. I alternated top and bottom coats each day (top in the morning, bottom in the evening), applying the same as I did with the control surfaces, using a 3” foam brush and sanding with 1000 grit sandpaper after 2 coats, then finishing with two top coats.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.