KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  5-22-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Sanding Wing Ribs

Started final sanding of the completed wing ribs in preparation for varnish. I've brought the assembled ribs home in order to keep them in a climate controlled area prior to varnish. The four on the left are sanded, as can be seen by the lack of excess epoxy and gusset material.

I only have 17 completed at this point, but I wanted to bring some work home for times that I can't be at the hangar. It will have to be done eventually, and this way I can just bring the assembled ribs home as I complete them (11 more needed), which will allow me to continue moving them through the process in a more controlled environment.
' style=

Assembled Ribs Ready for Sanding

Assembled Ribs Ready for Sanding

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.