KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  9-24-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Gluing Lift Struts

I discovered that I didn't allow enough cherry to allow for the angle of cut I wanted to make on the trailing edge, so I installed some mahogany strips to fill the gap. This should provide for a dark accent along side the cherry strips.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.