KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  2-17-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Diagonal Braces and Aileron Webbing

Finally!! A short break in the weather!! The temp got up into the 50s today... with a little help from the kerosene heater I was able to get the hangar warm enough to mix a little T-88.

First things first... to clean the shop up after the messy prop blast I got last Saturday.

Since all of the diagonal braces were already cut, all I needed to do was double check my alignment and mix a batch of glue.

With the 1/16" ply web in place on the aileron, I was also able to cut the aileron brace to the proper length. I'll glue it tomorrow.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.