KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
' style=
Date:  8-23-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Lift Strut - Inserts

Ripped 16 pieces of Brazilian Cherry for my lift strut inlays. These will be sandwiched between planks of spruce, and should look nice giving a light/dark contrast. The cherry should be dark reddish brown with varnish applied, or as Markle prefers.. pancake syrup.

New Gundy's resident Brian Fisher stopped by to lend a hand tonight. Brian is a wood shop teacher and he gave me a few pointers on ripping and planing this material.
' style=

Brazilian Cherry strips

Brazilian Cherry strips

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.