KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
Work Logs Found: 241
Category Work Time: 1209 Hours
 Date
Hours
Work Log Summary

Details

 03-14-2012
15.00
Sight Gauge + Fuel Pump
Details
       

 10-14-2011
4.47
Push to Talk Switch wires
Details
       

 07-23-2011
2.75
Fuel Pressure Gauge Sender
Details
     

 07-08-2011
5.50
Some more Electrical work completed
Details
       

 07-08-2011
4.50
Carburettors Heater
Details
       

 07-02-2011
3.75
Woodcomp SR200
Details
       

 03-18-2011
7.75
Some work on the Electrics
Details
       

 03-18-2011
1.25
Over Flow Bottle
Details
     

 02-01-2011
7.25
Regulator
Details
       

 01-02-2011
4.75
Some work on the Engine Cowls
Details
       

 12-27-2010
5.75
Air ducting
Details
       

 12-26-2010
3.00
Inlet for the fins on the engine cylinder head
Details
       

 12-26-2010
1.50
Air filter
Details
       

 12-14-2010
12.75
The Engine arrived
Details
       

 12-14-2010
1.00
Exhaust
Details
       

 09-21-2010
3.50
Designer door handle
Details
       

 09-04-2010
45.00
Still Filling
Details
     

 09-04-2010
45.00
Filling Compleat
Details
     

 05-05-2010
5.50
Filling seems endles.
Details
       

 05-01-2010
10.50
Wing Fairings
Details
       

 03-15-2010
3.75
Tidy up the baggage bay
Details
       

 03-05-2010
1.75
Fixing the Fuel Inlet Cover
Details
       

 03-02-2010
1.00
Stick Grips
Details
     

 03-02-2010
3.50
Compass
Details
       

 02-28-2010
5.50
Fuel inlet cover
Details
       

 02-27-2010
3.25
Stall Warner & Head-Set Jack
Details
       

 02-23-2010
2.50
Roof Panel
Details
     

 02-22-2010
4.50
Cover For the Fuel Sender
Details
       

 02-21-2010
0.50
Frel Pump Pipe
Details
       

 02-20-2010
3.50
Some Wiring
Details
       

 12-31-2009
15.00
Mass Balance Box Tidy Up
Details
       

 12-29-2009
55.00
Filling the Ailerons and the flaps
Details
       

 11-25-2009
45.00
Filling The Tailplains
Details
       

 10-23-2009
8.00
Filling the Rudder
Details
       

 10-04-2009
15.00
fuselage
Details
       

 10-02-2009
4.75
Learning How to Mix the Filler
Details
       

 07-01-2009
5.50
Checking Setup
Details
       

 06-05-2009
4.74
Bottom Of the Rudder
Details
       

 05-27-2009
4.24
Rudder Mod
Details
       

 05-25-2009
2.75
Roof Ply wood bridges
Details
       

 05-02-2009
4.75
The Spar Strap
Details
       

 04-27-2009
6.50
Cockpit Width Increase
Details
       

 04-24-2009
2.75
Wing Root reinforce of ply’s
Details
       

 04-24-2009
6.50
Flap Root Extensions
Details
       

 04-23-2009
1.75
Rear Tie Down
Details
       

 04-19-2009
5.50
Gas Strut Reposition mod
Details
       

 04-18-2009
4.50
Cockpit Air vents
Details
       

 04-16-2009
4.00
Ducting
Details
     

 04-14-2009
0.75
Sealing Plates
Details
     

 04-12-2009
5.75
Port door window Pop out
Details
       

 04-09-2009
5.50
Fuel Vent continued with my Fuel Mod
Details
       

 04-04-2009
8.50
Fitting The Widows
Details
       

 04-01-2009
6.50
Fitting the instrument panel
Details
       

 03-31-2009
3.25
Reinforce The Inside of the Door Area
Details
     

 03-29-2009
7.25
Fitting the doors
Details
       

 03-23-2009
4.75
The STBD Spar Pin
Details
       

 03-23-2009
2.00
The Fuel Filler
Details
     

 03-22-2009
2.00
Re-enforcing plys
Details
     

 03-21-2009
3.50
Fuel Filler Receptacle
Details
       

 03-15-2009
3.45
Wing Pin Stiffner
Details
       

 03-15-2009
3.75
Stabiliser Ribs and Stern Post
Details
       

 03-10-2009
4.50
Top On
Details
       

 03-08-2009
6.00
Well a big moment has finally arrived
Details
       

 03-07-2009
12.50
STBD wing is completed
Details
       

 03-01-2009
3.75
The Final fix of the top skin
Details
       

 02-27-2009
4.75
After the Redux had set
Details
       

 02-24-2009
6.00
Bonding the top trailing edge
Details
       

 02-22-2009
3.50
Tail Plane Retention Mod
Details
       

 02-21-2009
5.60
Site Gauge
Details
       

 02-20-2009
1.25
Spacer Support
Details
     

 02-18-2009
3.50
Rudder Cables
Details
       

 02-15-2009
6.75
Fitting The Baggage Bay
Details
       

 02-08-2009
3.25
Flap Drive Motor
Details
       

 02-01-2009
7.80
Flap Drive
Details
       

 01-25-2009
6.50
Baggage Bay
Details
       

 01-21-2009
2.25
Reinforcing Ply’s
Details
     

 01-18-2009
4.75
Fire Wall SS Panel
Details
     

 01-04-2009
1.00
Fuel Filler Cap
Details
       

 12-28-2008
5.90
Seat Pans
Details
       

 12-07-2008
5.50
Shutoff Valves
Details
       

 11-09-2008
5.75
Access Panel
Details
       

 11-02-2008
7.75
On Its Wheels
Details
       

 10-26-2008
6.75
Graham Singleton’s Rudder push rod mod
Details
       

 10-19-2008
6.50
Tie-Bar 2
Details
       

 10-14-2008
8.50
Tie-Bar
Details
       

 10-12-2008
1.50
Wing Pins
Details
       

 10-05-2008
2.75
Spar Blocks
Details
       

 10-04-2008
9.75
Wing Pin Blocks
Details
       

 10-02-2008
2.00
Too Close
Details
       

 09-28-2008
11.75
Wing Fitting
Details
       

 09-27-2008
8.50
Mass Balance Stop
Details
       

 09-23-2008
6.75
Preparing for bonding the top on
Details
       

 09-20-2008
4.00
Door recesses joined
Details
       

 09-17-2008
5.00
Removable Panel
Details
       

 09-14-2008
6.50
Access area under side
Details
       

 09-10-2008
2.25
Underside
Details
       

 09-06-2008
11.50
Rib 3 and 4
Details
       

 08-31-2008
6.75
Second Rib
Details
       

 08-30-2008
12.50
Setup
Details
       

 08-26-2008
5.50
Landing gear preparation
Details
       

 08-24-2008
2.25
Rubbing blocks
Details
       

 08-23-2008
6.75
Access Covers
Details
       

 08-20-2008
5.25
Fitting the Top
Details
       

 08-19-2008
5.75
Mass Balance
Details
       

 08-17-2008
5.75
Trim servo
Details
       

 08-15-2008
3.50
Torque Tube 2
Details
       

 08-13-2008
1.00
Torque Tube Clamps
Details
       

 08-10-2008
3.00
Torque Tube
Details
       

 08-03-2008
2.75
Landing Gear Frame
Details
       

 08-02-2008
4.25
Rudder Peddles 2
Details
       

 07-26-2008
2.75
Rudder Peddles
Details
       

 07-26-2008
1.00
Mod 72
Details
       

 07-15-2008
3.25
Reinforcing of the Firewall to CM
Details
       

 07-13-2008
4.50
Cut the holes
Details
       

 07-11-2008
3.75
Reinforcing of the Bulkhead and Baggage
Details
       

 07-09-2008
5.00
A Big Moment
Details
       

 07-06-2008
3.75
Prepared For Bonding
Details
       

 06-15-2008
5.25
Prepared and bonded
Details
       

 05-04-2008
10.00
Fuel Mod
Details
       

 04-28-2008
25.00
New Workshop
Details
       

 02-17-2008
5.50
Andair Fuel Selector
Details
       

 01-20-2008
3.75
Throttle & Parking Brake
Details
       

 01-13-2008
5.75
Finger Brakes.
Details
       

 01-10-2008
1.50
Access Hole
Details
       

 01-08-2008
2.25
Fuel tank Stops
Details
       

 01-05-2008
3.75
Fuel Tank Lay-up 2 & 3
Details
       

 01-01-2008
1.75
Fuel Tank First Bid Lay-up
Details
       

 12-28-2007
0.50
Finger Strainers
Details
       

 12-27-2007
3.25
Door Handles
Details
       

 12-23-2007
10.75
Door Latches
Details
       

 12-21-2007
2.00
Door Latch Covers
Details
       

 12-15-2007
2.50
Rear Bulkhead
Details
       

 12-09-2007
2.25
Fuel Gauge / Fuel Sender
Details
       

 11-30-2007
1.50
Fuel Tank Spacers
Details
       

 11-24-2007
1.75
Spar Bush Re-Enforcement
Details
       

 11-22-2007
3.75
Quick Connect Brackets
Details
       

 11-20-2007
6.50
Spar Sockets
Details
       

 11-18-2007
4.50
Torque Tube Rear Tufnol Bearing
Details
       

 11-11-2007
4.25
Control Stick and Torque Tube
Details
       

 11-06-2007
5.50
Thigh supports
Details
     

 11-04-2007
2.25
Cutting The Cockpit Module
Details
     

 11-03-2007
50.75
STBD Wing
Details
       

 10-20-2007
4.25
Stall Warner
Details
       

 09-29-2007
1.50
Mass balance boxes
Details
       

 09-23-2007
3.50
Tie Downs
Details
       

 09-16-2007
5.00
Fitting The Flaps
Details
       

 09-02-2007
2.00
Treating Metal Parts
Details
     

 08-28-2007
2.50
Mass Balance boxes Slots.
Details
       

 08-28-2007
4.00
Mass Balance
Details
       

 08-26-2007
3.00
Port aileron
Details
       

 08-25-2007
5.25
Fitted the Pitot/Static
Details
       

 08-19-2007
6.75
Prepared the w18 flap hinge plates for bonding in
Details
       

 08-11-2007
1.50
Aileron re-enforcing
Details
     

 08-11-2007
1.00
Aileron hinge re-enforcing
Details
     

 08-05-2007
4.00
Re-enforcing the wing root
Details
       

 08-04-2007
8.00
Wing has to be re-enforced
Details
       

 07-19-2007
3.00
MANDATORY Mod 73 Part 2
Details
       

 07-14-2007
3.00
MANDATORY Mod 73 part 1
Details
       

 12-28-2006
0.75
Signed off
Details

 04-09-2006
3.00
Pip Pins Drain Holes
Details
       

 04-08-2006
3.00
Pip pin Cover Mod
Details
       

 04-08-2006
1.75
All ready for drilling now
Details
       

 04-07-2006
2.50
Pip Pins
Details
     

 04-03-2006
3.00
Bushes
Details
       

 04-02-2006
0.75
Flatner Strips
Details
     

 04-01-2006
4.50
Drive Pin Layup
Details
       

 03-31-2006
4.25
Setup Of Drive Pins
Details
       

 03-29-2006
3.50
Reinfoment of drive pins
Details
     

 03-28-2006
2.00
Drive Pins
Details
     

 03-27-2006
1.50
Fiting Trim Tab
Details
     

 03-26-2006
3.75
Clean Up
Details
       

 03-25-2006
5.25
Port Closeout
Details
       

 03-22-2006
5.00
Trim Tab Prep and closeout
Details
       

 03-21-2006
1.00
Trim Tab Cut out
Details
     

 03-18-2006
5.00
STBD tailplane closeout
Details
       

 03-17-2006
1.25
STBD Closeout
Details
       

 03-14-2006
3.50
Port Top Serface
Details
     

 03-13-2006
1.50
Trim Tab Cut Out
Details
       

 03-12-2006
4.00
Port layup nuderside
Details

 03-12-2006
0.00
Nice And Warm
Details
       

 03-11-2006
3.50
Top Skin layup STBD.
Details
     

 03-05-2006
2.00
Port Tailplane Layup (Underside)
Details
     

 03-04-2006
3.50
STBD Tailplane Layup (underside)
Details
     

 03-01-2006
2.25
Tailplane Ready For Layup
Details
       

 03-01-2006
2.25
Prep for Laminating
Details
       

 02-28-2006
3.00
Washout
Details
     

 02-27-2006
1.00
Joining Together
Details
       

 02-26-2006
3.50
Signed Off
Details

 02-22-2006
1.50
Flap Hinge
Details
       

 02-21-2006
3.50
Flap Hinges
Details
     

 02-20-2006
2.50
STBD flap for the hinges
Details
       

 02-19-2006
6.50
Flap hinges
Details
     

 02-18-2006
3.50
Flap Hinged
Details
     

 02-17-2006
3.00
Cracked out the flap
Details
     

 02-16-2006
3.00
Laying up the top skin of the Port flap
Details
     

 02-15-2006
5.00
Preparing both flaps
Details
     

 02-12-2006
5.00
Pepard the STBD Flap for laminating
Details

 02-11-2006
5.00
Flap Layup STBD
Details
       

 02-10-2006
2.50
Joined Port Flaps Cors and Port ailaron Hinges
Details

 02-10-2006
2.50
Fitted Aileron Hinge to Port side
Details

 02-09-2006
3.50
Rib Cut Out
Details
     

 02-09-2006
3.50
Hinges
Details
     

 02-06-2006
2.50
Tip & Root Closeout
Details
     

 02-05-2006
2.50
Tip and Root close out
Details
     

 02-04-2006
4.75
Close Out
Details

 02-03-2006
3.00
all cleaned up
     

 02-02-2006
1.75
Close Out
Details
       

 02-01-2006
4.50
Layup
Details
       

 01-31-2006
2.25
Bottom Layups
Details

 01-30-2006
2.25
Layup
Details
     

 01-29-2006
1.75
Layup
Details
     

 01-27-2006
1.50
Ailerons
Details
     

 01-26-2006
2.50
Second Rib
Details

 01-25-2006
2.50
Taileplane Rib
Details
       

 01-24-2006
3.50
Torqu Tube
Details
       

 01-23-2006
1.25
Tailplane Rib Rebate
Details
     

 01-22-2006
5.50
Tailplane Prep
Details
     

 01-22-2006
2.30
Shaping
Details
       

 01-20-2006
3.50
Rudder Horn
Details
       

 01-19-2006
4.50
Fitted Anchor Nuts
Details
     

 01-17-2006
2.50
Rudder Horn
Details
     

 01-16-2006
3.00
Rudder Hinges
Details
     

 01-15-2006
3.50
Close Out
Details
     

 01-14-2006
0.50
Advice Needed
Details

 01-13-2006
2.00
Removing Rudder From jig Block
Details
     

 01-12-2006
2.50
Second Lay-up
Details
       

 01-11-2006
2.50
Second Lay-up Prep.
Details
     

 01-10-2006
3.00
First Lay-Up
Details
     

 01-09-2006
0.00
Biuld Book
Details

 01-08-2006
1.25
Rudder Prep for layup
Details
     

 01-08-2006
1.25
Ribs, After curing
Details
     

 01-07-2006
2.00
Flap Rib Prep.
Details
     

 01-06-2006
0.25
Resin Pump
Details

 01-06-2006
0.30
Hinges Prep.
Details

 01-04-2006
0.50
Hinges Rudder And Trim Tab
Details

 12-27-2005
1.50
Preparing rudder for the first skin lay-up
Details
       

 12-27-2005
2.00
Europa Chock
Details
     

 12-20-2005
3.00
Collect Stage 1 From Kirkbymoorside, Yorkshire

 10-01-2005
1.00
Work Bench
Details
     

 10-01-2005
1.00
Resin Storage
Details
     

 10-01-2005
1.00
Cloth cupboard
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.