Construction Of the Europa XS
' style=
Date:  3-25-2006
Number of Hours:  5.25
Manual Reference:  
Brief Description:  Port Closeout

Preceded with the Port tailplans close out. This has be completed as I did last week, but with not has much heat in the room as I left the heating on and it became too warm and I cot some bad air bubbles. This lay up has been one of the most difficult I have dun on both tailplans, but all completed now. This was the last big layup on the Stage one of the kit. Next I will move on to fitting the trim tabs and setting up both tailplanes in the torque tube. Close outs have been dificult