KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  11-2-2008
Number of Hours:  7.75
Manual Reference:  
Brief Description:  On Its Wheels

Continued with the Landing Gear. I wanted the Aircraft on it wheel. I painted the legs before sliding them into position and fitting the bolt at the top to hold them. Next is a simple assembly job for the breaks and wheels. All fitted to the axel and tighten up. The difficult part was drilling the axel for the split pin, but all went well. I also put on the front wheel.
' style=

Landing Gear and Brake

Landing Gear and Brake

' style=

Landing Gear

Landing Gear

' style=

Front Wheel

Front Wheel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.