KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  3-21-2009
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Fuel Filler Receptacle

Started to work on the fuel filler receptacle. First clean up the area with grit paper to get ready for bonding. I first put a piece of 3mm foam in the area to make up a small gap under the reciprocal. It is then bonded in place with redux and held in place with two Bid layups.
' style=

Preperation

Preperation

' style=

Bonding

Bonding

' style=

In Place now

In Place now

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.