Continued some work on the tail plane retention Mod. After the ply layups had been inspected by Graham. I could proceed and fill the holes on the underside. A block of foam is cut to size. It is fitted in and bonded after cutting the drainage hole. I used a plastic ½” tube for this. 3 Ply’s of bid are then laid over the top onto the surface. All ready for filling and sanding now.