KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  1-7-2006
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Flap Rib Prep.

Made the Flap Rib from the 5mm form core. Placing 2 plies of Bid on each side then covered with peal ply on each side, then weighed down until it has set before moving the weight, to leave a nice flat laminated piece to make the Flap ribs from.Sunday 8th Jan. 2006After curing, removed the peal ply and trimmed down the rough edges, It is now ready to be cut out to make the 2 rips for the flaps.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.