KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  3-13-2006
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Trim Tab Cut Out

I prepared the port side for laminating the top surface. It is prepared the same way I did earlier. All ready now for a day with 3 hours to spear.I went back into the workshop later and decided to cut out the trim tab on the STBD side. With some careful measuring, I then started to cut. All went well and it is now time to get the tailplane ready for the final closeouts.
' style=

Trim Tab Cut Out

Trim Tab Cut Out

' style=




' style=

Nice Cutout

Nice Cutout

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.