KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  3-15-2010
Number of Hours:  3.75
Manual Reference:  
Brief Description:  Tidy up the baggage bay

To Tidy up the baggage bay where the landing gear is fixed . I made a cover panel for this. I sandwiched a piece of 3mm foam in-between 2 ply’s of bid. It sits in a “u” shape Alli. fixed to the seat back And is held in place with 3 anchor nuts.
' style=

3mm foam in-between 2 ply’s “u” shape Alli

3mm foam in-between 2 ply’s “u” shape Alli

' style=

3 anchor nuts Hard Point

3 anchor nuts Hard Point

' style=

In Place

In Place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.