KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  1-2-2011
Number of Hours:  4.75
Manual Reference:  
Brief Description:  Some work on the Engine Cowls

Some work on the Engine Cowls, before fixing preparation is needed to open up the vents and the opening for the propeller hub. I also made the hatches for inspection of the Coolant and Oil Levels
' style=

Prop Hub Opening

Prop Hub Opening

' style=

Air Inlet

Air Inlet

' style=

Hatches for inspection

Hatches for inspection

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.