KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  3-1-2006
Number of Hours:  2.25
Manual Reference:  
Brief Description:  Prep for Laminating

Getting ready for the bottom skin lay-ups on the tailplanes. Spent time getting both ready at the same time, I fastened the jig blocks and the tailplans to the bench so their was no moment and also to make every thing level. I then added all the peal-ply to the relevant places. All is ready now, but I will only laminate one at once as doing both will take a long time on my own.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.