KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  9-6-2008
Number of Hours:  11.50
Manual Reference:  
Brief Description:  Rib 3 and 4

Rib 3 and 4 are added the same, into the corners and reduxed into position. One the Redux has set; I added layups lapping into the other ribs. This is a very heavy layup. ( it has to be)

After cure, the top of the ribs are rounded off and uni is applied long ways to tie everything together.

About 40 hours work

The bolt washers where also reduxed in to provide a flat area for the bolts.
' style=

Rib 3 and 4

Rib 3 and 4

' style=

Uni the top

Uni the top

' style=

All finished

All finished

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.