KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  2-1-2009
Number of Hours:  7.80
Manual Reference:  
Brief Description:  Flap Drive

I set up the fuselage again and worked on the flap drive. First getting the flap drive bar to the correct length and inserting the bearings. I then marked out the fuselage floor to cut out the slots for the hinges. After getting everything set up for bonding the hinges to the floor the parts are removed for scuff sanding. Once the Redux had cured the hinges are drilled and bolted.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.