KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  2-2-2006
Number of Hours:  1.75
Manual Reference:  
Brief Description:  Close Out

I today prepared for the Aileron L.E. close out. First cutting away the foam on the L.E. to make a flange where the hinges will be fixed. I have to be carefully not to make the curved filet of Micro in the bottom of the close out too big or I will have problems fixing the hinges later. I have put masking tape on the flange and L.E. to keep the slurry off the surfaces. All ready now.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.