KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  3-10-2009
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Top On

Final bonding of the top onto the bottom of the fuselage. I set the top over the bottom half. After putting a bed of Redux around the flange, with a NEW Empty bath sealant tube (this has never had silicon in it) I then lower the top down onto the bottom half holding it apart with some blocks of foam util I was ready to put the two half's together.

Once happy I released thy foam and fastened the two half's together with clecos and small bolts. All Finished after clearing away the excess Redux.
' style=

FW Heald With small Bolts & Nuts

FW Heald With small Bolts & Nuts

' style=

Bagage bay Bonded

Bagage bay Bonded

' style=

Now it's an Aircraft

Now it's an Aircraft

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.