Date
|
Hours
|
Work Log Summary

|
Details

|
08-11-2014
|
4.50
|
Empennage Fairing - Continued.
|
Details
|
|
|
02-27-2014
|
7.00
|
Empenage installation.
|
Details
|
|
|
02-26-2014
|
4.00
|
Installed HS and trim cable to trim tab.
|
Details
|
 |
|
08-05-2011
|
4.00
|
Empenage end caps - Part 9.
|
Details
|
|
|
08-03-2011
|
4.00
|
Empenage end caps - Part 8.
|
Details
|
 |
|
08-02-2011
|
3.00
|
Empenage end caps - Part 7.
|
Details
|
|
|
08-01-2011
|
2.70
|
Empenage end caps - Part 6.
|
Details
|
  |
|
07-31-2011
|
2.30
|
Empenage end caps - Part 5.
|
Details
|
|
|
07-30-2011
|
3.30
|
Empenage end caps - Part 4.
|
Details
|
|
|
07-25-2011
|
0.30
|
Empenage end caps - Part 3.
|
Details
|
 |
|
07-22-2011
|
1.00
|
Empenage end caps - Part 2.
|
Details
|
 |
|
07-13-2011
|
4.70
|
Vertical Stabilizer end cap
|
Details
|
|
|
07-12-2011
|
3.00
|
Rudder counterweight and end cap.
|
Details
|
|
|
10-24-2007
|
5.00
|
Installed lower rudder fiberglass tip.
|
Details
|
|
|
10-23-2007
|
3.00
|
Riveted Elevator tips.
|
Details
|
|
|
10-01-2007
|
4.10
|
Installed Elevator Tips.
|
Details
|
|
|
09-29-2007
|
2.70
|
Completed the Elevator Trim Tab.
|
Details
|
|
|
09-28-2007
|
3.20
|
Riveted Trim Tab lower spar / drilled hinge holes.
|
Details
|
|
|
09-27-2007
|
2.00
|
Prepared and primed Elevator Trim Tab.
|
Details
|
|
|
09-26-2007
|
4.00
|
Trim Tab spar countersinking and end riblet.
|
Details
|
|
|
09-25-2007
|
1.00
|
Trim Tab take two.
|
Details
|
|
|
09-25-2007
|
2.00
|
Drilled control horn & match drilled skin to spar.
|
Details
|
|
|
09-25-2007
|
2.00
|
Clamped and bent the bottom tab up.
|
Details
|
|
|
09-25-2007
|
1.00
|
Bent the top tab down.
|
Details
|
|
|
07-27-2007
|
2.50
|
Re-installed Elevators and installed connection.
|
Details
|
|
|
07-27-2007
|
2.50
|
Drilled holes in Elevator control horns.
|
Details
|
|
|
07-26-2007
|
1.50
|
Primed and blind riveted Elevator leading edges.
|
Details
|
|
|
07-26-2007
|
1.50
|
Installed Elevators and trimmed HS outboard ends.
|
Details
|
|
|
07-26-2007
|
1.00
|
Finished Elevator leading edge blind rivets.
|
Details
|
|
|
07-26-2007
|
1.00
|
Fabricated a drill bushing.
|
Details
|
|
|
07-25-2007
|
4.00
|
Finished rolling Elevator L/E and match drilled.
|
Details
|
|
|
07-22-2007
|
5.00
|
Rolling the Elevator leading edges.
|
Details
|
|
|
07-21-2007
|
2.50
|
Finished Horizontal Stabilizer.
|
Details
|
|
|
07-20-2007
|
2.50
|
Riveted HS-707/708 to both HS skins.
|
Details
|
|
|
07-20-2007
|
3.00
|
Finished bucking remaining rivets on the HS skin.
|
Details
|
|
|
07-09-2007
|
1.50
|
Trim Tab construction (4).
|
Details
|
|
|
07-09-2007
|
0.50
|
Trim Tab construction (3).
|
Details
|
|
|
07-09-2007
|
0.20
|
Trim Tab construction (2).
|
Details
|
|
|
07-09-2007
|
4.00
|
Trim Tab construction (1).
|
Details
|
|
|
07-08-2007
|
4.00
|
Riveted the L/H Elevator skin to understructure.
|
Details
|
|
|
07-08-2007
|
2.00
|
Fabricated a better 'Riblet' for L/H Elevator.
|
Details
|
|
|
07-07-2007
|
4.00
|
Fabricated L/H Elevator 'Riblet'.
|
Details
|
|
|
07-06-2007
|
4.00
|
Riveted the right hand Elevator skin.
|
Details
|
|
|
07-04-2007
|
1.00
|
Attached Rudder to Vertical Stabilizer.
|
Details
|
|
|
07-03-2007
|
3.45
|
Rolled rudder leading edge and set blind rivets.
|
Details
|
|
|
07-03-2007
|
3.00
|
Riveted Rudder skin to understructure.
|
Details
|
|
|
07-03-2007
|
1.25
|
Prepared Rudder leading edge for rolling.
|
Details
|
|
|
05-15-2007
|
1.00
|
Riveted the VS skin on to it's understructure.
|
Details
|
|
|
05-15-2007
|
1.00
|
Removed the vinly from the VS and tidied up.
|
Details
|
|
|
05-15-2007
|
2.00
|
Pre-cover inspection completed on empenage.
|
Details
|
|
|
05-11-2007
|
1.20
|
Set skeleton rivets and attached control horn.
|
Details
|
|
|
05-11-2007
|
3.30
|
Riveted the elevator skeleton.
|
Details
|
|
|
05-07-2007
|
3.00
|
Prepared and primed elevator skeleton.
|
Details
|
 |
|
05-06-2007
|
1.00
|
Dimpled E-713 R/H counterweight skin.
|
Details
|
|
|
05-06-2007
|
2.50
|
Dimpled E-713 L/H and countersunk E-606PP.
|
Details
|
|
|
05-05-2007
|
2.30
|
Deburred elevator skins and understructure.
|
Details
|
|
|
05-03-2007
|
3.50
|
Match drilled skin to elevator understructure.
|
Details
|
|
|
05-02-2007
|
3.20
|
Bent the elevator trailing edges.
|
Details
|
|
|
05-01-2007
|
1.00
|
Set remaining rivets on elevator stiffeners.
|
Details
|
|
|
04-30-2007
|
2.50
|
Preparing the right and left elevators.
|
Details
|
|
|
04-29-2007
|
4.00
|
Riveted elevator stiffeners in place.
|
Details
|
|
|
04-29-2007
|
2.50
|
Completed the Trim Servo access plate.
|
Details
|
|
|
04-28-2007
|
6.00
|
Cleaned and primed elevator stiffeners.
|
Details
|
|
|
04-20-2007
|
2.50
|
Dimpled elevator stiffeners and skins.
|
Details
|
|
|
04-19-2007
|
7.00
|
Match drilled elevator stiffeners and deburred.
|
Details
|
|
|
04-18-2007
|
5.50
|
Trimmed and edge finished elevator stiffeners.
|
Details
|
|
|
04-17-2007
|
0.20
|
Torqued the HS-411PP center bearing bolts.
|
Details
|
 |
|
04-16-2007
|
5.00
|
Riveted the rudder understructure.
|
Details
|
|
|
04-16-2007
|
0.20
|
Riveted the rudder top rib to the C/W skins.
|
Details
|
|
|
04-15-2007
|
5.50
|
Cleaned and primed rudder components.
|
Details
|
|
|
04-12-2007
|
3.00
|
Dimpled and edge finished Rudder components.
|
Details
|
|
|
04-11-2007
|
0.60
|
Rudder bottom attach strips installed.
|
Details
|
|
|
04-11-2007
|
1.00
|
Match drilled rudder components.
|
Details
|
|
|
04-10-2007
|
3.00
|
Worked on Rudder Horn and Brace.
|
Details
|
|
|
04-10-2007
|
1.00
|
Fluted and match drilled top rib R-703.
|
Details
|
|
|
02-13-2007
|
0.10
|
Partially completed Rudder and HS.
|
Details
|
|
|
02-12-2007
|
2.50
|
Started bending the rudder trailing edge.
|
Details
|
|
|
02-12-2007
|
2.00
|
Completed the rudder trailing edge bend.
|
Details
|
|
|
02-11-2007
|
4.75
|
Riveted the Rudder stiffeners.
|
Details
|
|
|
02-10-2007
|
2.00
|
Riveted L/H Rudder skin to skeleton.
|
Details
|
|
|
02-10-2007
|
2.00
|
Finished the Rudder skin riveting.
|
Details
|
|
|
02-09-2007
|
1.50
|
Primed the Rudder stiffeners and skin rivet lines.
|
Details
|
|
|
02-07-2007
|
0.20
|
Dimpled Rudder stiffeners.
|
Details
|
|
|
02-06-2007
|
1.00
|
Deburred and dimpled the Rudder skin.
|
Details
|
|
|
02-06-2007
|
4.00
|
Cut and finished Rudder stiffeners.
|
Details
|
|
|
02-05-2007
|
1.00
|
Marked and cut the Rudder stiffeners.
|
Details
|
 |
|
02-05-2007
|
0.75
|
Angle drilled and riveted HS-810-1 / HS-814.
|
Details
|
|
|
02-04-2007
|
2.00
|
Finished riveting HS-810-1 / 814.
|
Details
|
|
|
02-04-2007
|
0.20
|
Finished dimpling the VS skin.
|
Details
|
|
|
02-03-2007
|
4.00
|
Primed HS-810-1 and riveted it front HS-814/spar.
|
Details
|
|
|
02-02-2007
|
3.00
|
Riveted the VS skeleton.
|
Details
|
|
|
02-02-2007
|
2.50
|
Match drilled / bent replacement HS-810-1.
|
Details
|
|
|
02-01-2007
|
3.50
|
Riveted VS rear spar, doubler and hinge brackets.
|
Details
|
|
|
02-01-2007
|
0.50
|
Dimpled VS skin and clecoed rear doubler and hinge
|
Details
|
|
|
01-31-2007
|
3.75
|
Counter sunk VS doubler, primed skeleton
|
Details
|
|
|
01-31-2007
|
3.25
|
Cleaned and primed all internal VS parts
|
Details
|
|
|
01-30-2007
|
5.50
|
Edge preped, deburrerd and dimpled VS
|
Details
|
|
|
01-29-2007
|
5.00
|
Match drilled VS skeleton and skin
|
Details
|
|
|
01-28-2007
|
4.90
|
Drilled the lightening holes in the VS doubler
|
Details
|
|
|
01-28-2007
|
0.10
|
Completed VS doubler
|
Details
|
|
|
01-27-2007
|
5.00
|
Riveted the HS rear spar
|
Details
|
|
|
01-27-2007
|
1.00
|
HS rear spar hinge bracket installation.
|
Details
|
|
|
01-26-2007
|
4.00
|
Primed HS rivet lines and other HS parts
|
Details
|
|
|
01-24-2007
|
4.50
|
HS skin dimpling and edging
|
Details
|
|
|
01-23-2007
|
1.50
|
Finished preping R/H HS skin
|
Details
|
|
|
01-22-2007
|
2.75
|
HS Skin vinyl removal and hole deburring
|
Details
|
|
|
01-21-2007
|
5.00
|
HS understructure dimpling
|
Details
|
|
|
01-20-2007
|
4.00
|
More right hand side of Horizontal Stabilizer.
|
Details
|
|
|
01-19-2007
|
5.00
|
Continued with Horizontal Stabilizer.
|
Details
|
|
|
11-25-2006
|
2.00
|
Finished priming HS skeleton
|
Details
|
|
|
11-24-2006
|
6.00
|
Match drilled and primed HS skeleton
|
Details
|
|
|
11-23-2006
|
2.50
|
Drilling the Horizontal Stabilizer
|
Details
|
|
|
11-22-2006
|
5.00
|
Deburred and fluted HS skeleton assembly
|
Details
|
 |
|
11-20-2006
|
3.00
|
Marked holes for HS-405 ribs
|
Details
|
|
|
11-19-2006
|
2.00
|
Prepared forward spar center section
|
Details
|
|
|
11-14-2006
|
2.00
|
Rear spar bracket assemblies.
|
Details
|
|
|
11-14-2006
|
0.50
|
Completed the riveting of the HS-411 hinge.
|
Details
|
|
|
11-13-2006
|
4.50
|
Rear Spar
|
Details
|
|