Powered By Kitlog Pro v2.0
Jeff Mitchell's RV8 project
RV-8
Empennage
2-26-2014
< Previous Log Entry
Next Log Entry >
Date:
2-26-2014
Number of Hours:
4.00
Manual Reference:
Various
Brief Description:
Installed HS and trim cable to trim tab.
I attached the horizontal stabilizer and elevators. Then connected the trim cable to the trim tab and verified I got the allowable maximum deflection as per section 15.
Trim tab connected to cable
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1018
4065
Ailerons
25
84
Avionics
64
344
Empennage
118
324
Engine
4
17
Firewall Forward
61
308
Flaps
11
51
Fuel Tanks
54
190
Fuselage
457
1889
Misc Pics
6
4
Miscellaneous
26
215
Pics of me building
6
4
Prop
2
11
Tools
12
10
Training Kits
8
24
Wings
153
557
Workshop Setup
11
33
Copyright © 2001-2024 Matronics. All Rights Reserved.