Brief Description: Match drilled elevator stiffeners and deburred.
There was not much worth taking pictures of today. I spent most of it match drilling the stiffeners for both the left and right hand elevators. I then deburred all the stiffeners, the elevator trim panel and the inside of both skins. I then removed the vinyl along the rivet lines on the outside of both the elevator skins.
Next is to debur the outside of the skins and then dimple everything except the spars and ribs.