Powered By Kitlog Pro v2.0
Brent s RV-8 Project N784DE
RV-8
Firewall Forward
131 Logs Found
Date
Hours
Work Log Summary
Details
03-31-2011
0.9
Hose protection
Details
03-13-2011
1.2
Baffle sealing #2
Details
03-12-2011
0.7
Sniffle valve / Mixture arm finished
Details
03-12-2011
0.5
Sealing the baffling
Details
03-10-2011
0.5
Sniffle Valve install
Details
03-09-2011
1.3
Fuel Pump Safety Wire and Drain
Details
02-24-2011
1.0
Tach Drive Cover / Engine controls final
Details
02-23-2011
1.4
Adel Clamping bliss/Engine Controls final
Details
02-22-2011
1.0
Adel clamping bliss
Details
02-20-2011
1.0
Throttle rigging - the solution
Details
02-13-2011
3.6
Oil Breather Vent + FWF Finsihing
Details
01-30-2011
1.1
Wiring Hobbs Pressure Switch
Details
01-29-2011
1.4
More Engine Control Rigging Fun...
Details
01-28-2011
1.0
Engine Control Cable Rigging continued...
Details
01-27-2011
1.7
Engine Control Cable Rigging / Hobbs Switch
Details
01-26-2011
0.7
Magneto leads #6
Details
01-25-2011
1.1
Magneto leads #5
Details
01-23-2011
3.9
Engine wiring #6 +
Details
01-22-2011
2.6
Magneto leads #4 and Current limter
Details
01-21-2011
1.0
Magneto leads #3
Details
01-20-2011
1.0
Magneto leads #2
Details
01-19-2011
1.0
Magneto leads #1
Details
01-18-2011
1.2
Heat shield/Exhaust Hanger/Canopy
Details
01-17-2011
1.1
Magnetor Vibrator Mounting +
Details
01-16-2011
1.1
Fuel Flow Sensor / RPM Sensor
Details
01-15-2011
4.5
Misc FWF (fuel lines and fat wires)
Details
01-15-2011
1.0
Fuel Lines / Mags / Vernatherms
Details
01-14-2011
1.4
Fuel System FWF #2
Details
01-12-2011
1.0
Engine Wiring #5
Details
01-11-2011
1.5
Engine Wiring #4
Details
01-10-2011
1.0
Engine Wiring #3
Details
01-09-2011
1.2
Engine Wiring #2
Details
01-08-2011
2.9
Engine Wiring #1
Details
01-06-2011
1.0
Baffling #37 / Dipstick Tube re-install
Details
01-05-2011
0.3
Engine Mounts/Baffling #36
Details
01-04-2011
1.4
Baffling #35/Cabin Heat Scat/Engine Mounts
Details
01-04-2011
1.0
Baffling #34
Details
01-03-2011
1.2
Cabin Heat Muff Install
Details
01-02-2011
2.6
Optional Oil Filter Install
Details
12-24-2010
1.7
Baffling #33 + (engine attach hardware/oil filter)
Details
12-23-2010
1.4
Baffling #32
Details
12-22-2010
1.0
Baffling #31
Details
12-21-2010
2.0
misc FWF (oil lines / baffling)
Details
12-20-2010
0.5
Oil System FWF #8
Details
12-19-2010
1.8
Oil System FWF #7
Details
12-19-2010
2.7
Crankshaft drive bushing #3
Details
12-18-2010
0.0
misc FWF (removing prop bushings, fittings for red
Details
12-18-2010
0.0
misc FWF (blast tubes)
Details
12-18-2010
0.0
Misc FWF (alt air, avionics acces pics)
Details
12-18-2010
3.5
Misc FWF
Details
12-14-2010
1.0
Oil System FWF #6
Details
12-12-2010
4.4
Engine control rigging
Details
12-11-2010
1.1
Misc FWF
Details
12-05-2010
3.3
Alternate air/Cowling Nutplates
Details
12-04-2010
3.6
Cabin Heat / Engine Probes
Details
12-03-2010
0.7
Oil System FWF #5
Details
12-01-2010
0.5
Oil System FWF #4
Details
11-30-2010
2.8
Oil System FWF #3
Details
11-29-2010
1.9
Oil System FWF #2
Details
11-26-2010
1.3
Oil System FWF #1
Details
11-26-2010
2.5
Fuel System FWF #2
Details
11-25-2010
0.9
Fuel System FWF #1
Details
11-25-2010
2.8
Engine Control Cables 1
Details
11-24-2010
1.1
Baffling #28 +
Details
11-23-2010
1.6
Baffling #27
Details
11-22-2010
1.1
Baffling #26
Details
11-21-2010
3.2
Baffling #25
Details
11-20-2010
3.6
Baffling #24
Details
11-19-2010
1.1
Baffling #23
Details
11-18-2010
1.5
Baffling #22
Details
11-17-2010
1.8
Baffling #21
Details
11-16-2010
1.5
Baffling #20
Details
11-15-2010
1.0
Baffling #19
Details
11-14-2010
2.1
Baffling #18
Details
11-13-2010
4.7
Baffling #17
Details
11-12-2010
1.5
Baffling #16
Details
11-11-2010
2.5
Baffling #15
Details
11-10-2010
1.3
Baffling #14 (thermonuclear proof oil cooler)
Details
11-09-2010
1.6
Baffling #13 (thermonuclear resistance)
Details
11-08-2010
4.0
Baffling #12
Details
11-07-2010
1.2
Baffling #11
Details
11-06-2010
3.3
Baffling #10
Details
11-05-2010
1.6
Baffling #9 (1800 hr mark)
Details
11-04-2010
1.8
Baffling #8
Details
11-03-2010
0.5
Baffling #7
Details
11-02-2010
1.1
Baffling #6
Details
10-31-2010
1.6
Snorkel #12
Details
10-28-2010
1.0
Snorkel #11
Details
10-27-2010
0.3
Snorkel #10
Details
10-26-2010
1.1
Snorkel #9
Details
10-25-2010
1.1
Snorkel #8 and Baffle #5
Details
10-24-2010
3.8
Snorkel #7
Details
10-23-2010
3.7
Snorkel #6
Details
10-22-2010
0.8
Snorkel #5
Details
10-21-2010
1.0
Snorkel #4
Details
10-19-2010
1.5
Snorkel #3
Details
10-18-2010
2.5
Snorkel #2
Details
10-17-2010
0.6
Snorkel #1
Details
10-17-2010
2.3
Baffling #4
Details
10-16-2010
3.5
Baffling #3 (fitting...still)
Details
10-15-2010
1.7
Baffling #2 (baffled and going snorkleing)
Details
10-14-2010
3.3
Baffling #1 (initial fitment)
Details
08-21-2010
1.7
Oil tank line
Details
08-18-2010
1.7
Cabin Heat Mixer #2
Details
07-26-2010
1.0
Prop Install
Details
07-25-2010
4.7
Crankshaft drive bushings
Details
07-25-2010
0.5
Crankshaft drive bushing #2
Details
07-24-2010
1.9
Crankshaft rear plug install
Details
07-09-2010
1.0
Removing the old baffling
Details
07-08-2010
0.0
Engine grief
Details
06-17-2010
0.5
Removed stubborn fitting (conversion to C/S prop)
Details
06-12-2010
4.0
Spinner and prop
Details
06-12-2010
0.0
Prop
Details
06-11-2010
1.1
Spinner #2
Details
06-10-2010
1.2
Conversion to C/S and Spinner
Details
06-08-2010
2.3
Mixture bracket
Details
06-07-2010
1.2
Throttle bracket +
Details
05-31-2010
4.5
Governor/Inverted Oil +
Details
05-31-2010
1.7
Alternator Install #1
Details
05-30-2010
4.5
Prop governor install #1
Details
05-29-2010
2.0
Exhaust install #3
Details
05-28-2010
0.8
Exhaust install #2
Details
05-27-2010
1.2
Exhaust Install #1
Details
05-26-2010
1.1
Intake tubes install
Details
05-25-2010
1.2
Oil pressure line complete and manifold mounted
Details
05-24-2010
0.6
Oil Pressure line
Details
05-23-2010
2.7
Engine installed
Details
05-23-2010
0.9
Cabin heat mixing box
Details
05-18-2010
1.2
Started assessing Firewall Forward components
Details
03-24-2010
1.2
Test fitted exhaust system
Details
03-23-2010
1.5
Hung engine
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
All
About me
Avionics
BENCHMARKS
Elevators
Empennage
Engine
Finishing
Firewall Forward
Fuselage
Hints and Tips
Horizontal Stab
Inspiration
Instrument Panel
Miscellaneous
Paint
polishing
post construction mx
PROGRESS CHARTS
Rudder
Shop
Shop Supplies
Tools
Vertical Stabilizer
What is an RV8
Wings
Wiring
Copyright © 2001-2013 Matronics. All Rights Reserved.