KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  12-18-2010
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Misc FWF

Jumped around abunch today
-Located and mounted the manifold pressure sensor on the side of the GPS shelf. Still need alittle hose clamp for the hose to hook to the sensor.
-Located the blast tubes for alternator, each magneto, and the fuel pump. Drilled them to 11/16 with a unibit and installed the tubing. I am leaving it loose for now.
-ACS sent the little adel clamp I needed to attached the cable sheath so I finished the alt air door installation.
-Trimmed the avionics access door to clear the support for the modified baggage door skin addition.
-Put the steel AN nipple fittings on the red cube. I ordered the wrong hose ends so I can't complete the installation for now.
-Started removing the prop bushings using my engineer friend Mike Cencula's elegant removal tool - works great Mike! I ran out of time, but the first one came out with ease.
' style=

Manifold Pressure Sensor (MAP) on the GPS shelf

Manifold Pressure Sensor (MAP) on the GPS shelf

' style=

Manifold pressure tapped into the #4 cylinder

Manifold pressure tapped into the #4 cylinder

' style=

GPS shelf and MAP sensor with hose on the firewall.

GPS shelf and MAP sensor with hose on the firewall.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.