KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  1-4-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Baffling #34

Had to interrupt the cabin heat install to secure the part of the baffling that wraps around the cylinders.
After alittle learning curve it went pretty smooth. I have about :30 more to do on this.
' style=

Note the safety wire. That goes inside the plastic tubing and pulls the cylinder wraps down tight

Note the safety wire. That goes inside the plastic tubing and pulls the cylinder wraps down tight

' style=

The big tube is an oil line. The tube with safety wire in the background is it.

The big tube is an oil line. The tube with safety wire in the background is it.

' style=

Both the heads and the cylinders get this treatment

Both the heads and the cylinders get this treatment

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.