Powered By Kitlog Pro v2.0
Brent s RV-8 Project N784DE
RV-8
Firewall Forward
12-21-2010
< Previous Log Entry
Next Log Entry >
Date:
12-21-2010
Number of Hours:
2.00
Manual Reference:
Brief Description:
misc FWF (oil lines / baffling)
-Safetied the ravel oil sump fitting to the sump
-Torqued the governor oil lines on both ends
-Installed an adel on the governor line to stablize it
-Started riveting the airseal along the top of the baffling (got about half done)
Safetied the raven sump fitting
Adel clamp on the governor oil line
Black airseal going on with blind steel rivets
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1571
2427
About me
1
Avionics
1
2
BENCHMARKS
26
25
Elevators
38
51
Empennage
13
15
Engine
2
4
Finishing
352
646
Firewall Forward
131
219
Fuselage
431
586
Hints and Tips
1
Horizontal Stab
37
50
Inspiration
1
Instrument Panel
1
Miscellaneous
13
2
Paint
22
69
polishing
40
101
post construction mx
1
PROGRESS CHARTS
2
Rudder
16
24
Shop
1
Shop Supplies
1
Tools
7
Vertical Stabilizer
9
15
What is an RV8
1
Wings
315
407
Wiring
108
211
Copyright © 2001-2024 Matronics. All Rights Reserved.