KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  1-21-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Magneto leads #3

-Continued to work on the shower of sparks P-leads. This half dozen wires seem simple, but it's not going very fast. Oh well, like a my buds say, 'an hour behind you is infinitely better than an hour in front of you'.
-Wired up the left mag (at the mag only) and the vibrator (at the vibrator only).

Next step is to wire up the right mag P lead and then move inside and do the cockpit switches.
' style=

Vibrator P leads wired. Still have to do the grd

Vibrator P leads wired. Still have to do the grd

' style=

Pic is tilted to get a clear view but that is the back of the left mag and the leads

Pic is tilted to get a clear view but that is the back of the left mag and the leads

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.