KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  11-20-2010
Number of Hours:  3.60
Manual Reference:  
Brief Description:  Baffling #24

-Bonded the upper cowl inlet ramps in place.
-Finished drilling the airseal material to the baffling
-Installed airseal onto the right inlet ramp - unfortunatley I screw'd up and my holes moved into the edge - I like fitting it to the cowl better anyway like the left side.
-Fitted the airseal to the left inlet. Fab'd a reinforcement/backing strip of .020 to help reinforce the rivets.
-Did some fitting of the cowl - need to work on getting the airseal some 'memory' so it lays down properly.
-
' style=

Inlet ramps flox'd into place

Inlet ramps flox'd into place

' style=

Airseal in place all the way around

Airseal in place all the way around

' style=

Airseal cleco'd to the cowl to test fit

Airseal cleco'd to the cowl to test fit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.