-Finished up the oil cooler installation. Everything looks good. Now time to make doublers for the bolt holes that go through the rear baffling. There are 3 left to do. I cut out the material .032 and layed out the rivet patterns and drilled/deburred. I went kind of overkill on these, but hey that's been the theme for the baffling. So much for building it light... Next step riveting. I'm forgoing the primer for the baffling as there is no way it won't shake itself apart before it corrodes.
Oil cooler done (for now)
Doubler fabrication for one of the rear baffle bolt holes