KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  5-29-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Exhaust install #3

Finished up the supports. Got everything lined up to my satisfaction and then tightened everything down. I also torqued the header nuts to 120 inch pounds. I started looking at the cabin heat muff. I'm going to hold on that until I see where everything goes as I think I will run it on the crossover versus the plans calling for it on the #1 header.
' style=

Clamps for the pipes that tie it back to the oil sump bolts

Clamps for the pipes that tie it back to the oil sump bolts

' style=




' style=

These unions stay loose to let the system move without cracking

These unions stay loose to let the system move without cracking

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.