KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  10-17-2010
Number of Hours:  2.30
Manual Reference:  
Brief Description:  Baffling #4

-Continued to work on securing the baffling to the engine - this time the front ramps were the focus. I drilled the holes per the plans for the various brackets in the front. I also riveted together the bracket on the left front that run parallel to the crankshaft and goes under the ramp to support it.
Now that the front ramp location are fixed I can start on the snorkel.
' style=

Right front ramp fitted (the fwd edge has yet to be trimmed)

Right front ramp fitted (the fwd edge has yet to be trimmed)

' style=

The underside of the left ramp shows the various attach points.

The underside of the left ramp shows the various attach points.

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.