-Started working on the alternate air source. -Riveted the bracket onto the snorkel - it was already epoxy'd on. -Located the cable in the cockpit and drilled the holes in the left gear tower and firewall. -Routed the cable along the left side of the engine. I broke one of the supplied #3 adels so I couldn't finish the job - rats.
Moved to the nutplates on the bottom of the cowl -Deburred and c/s the rivet holes -Installed the nutplates Reinstalled the lower cowl. I'll put the top cowl on next session and start on the fwd baggage door. I have to order some fittings and misc parts for my FWF so I need something else to work on.
Alt air door. Waiting on an adel clamp to finish this mini project
Bottom black knob is the alternate air source. The cabin heat is above & the T is parking brake
Nutplates in the background there is another set on the other side of the bottom cowl